Super Current Affairs

Scheme

Amrit Bharat Station Scheme: complete guide

A Ministry of Railways mission to redevelop 1309 railway stations across India with modern passenger amenities and city integration, for railway passengers and city planners.

Updated: 16 November 20261 storyUPPSCRailwayUPSSSC PETUPPSC RO/ARO

Indian Railways has moved from earlier station schemes that mostly upgraded passenger amenities to a comprehensive, phased redevelopment model. The Amrit Bharat Station Scheme (ABSS) is designed around master plans for each station, covering multimodal integration, better links with the surrounding city and station designs that reflect local architecture and culture.

The scheme envisages phased improvements, multimodal integration and the creation of city centres at stations in the long term.PIB

In the story, Kanpur Central Railway Station is being modernised under this scheme, alongside a 16-km elevated corridor between Anwarganj and Mandhana that is meant to ease level-crossing congestion.Indian Express

Amrit Bharat Station Scheme: quick facts

Launch date
Launched by PM Narendra Modi on 6 August 2023
Parent ministry
Ministry of Railways
Stations covered
1309 railway stations nationwide

Key facts

Launch dateLaunched by PM Narendra Modi on 6 August 2023PIB
Parent ministryMinistry of Railways
Stations covered1309 railway stations nationwideindia.gov.in
Nature of schemePhased redevelopment with a long-term visionPIB
First phase inauguration103 stations across 18 States and UTs inaugurated on 22 May 2025 at a cost of over ₹1,100 crore
Predecessor schemeAdarsh Station Scheme (covering 1253 stations), which mainly focused on passenger amenities

Key features and how it works

  • Master-plan based redevelopment: each station gets a master plan, implemented in phases to improve access, circulating areas, waiting halls, toilets, lifts and escalators, cleanliness, free Wi-Fi and landscaping.PIB
  • Multimodal integration and city connectivity: the station is integrated with both sides of the city, with multimodal links and city centres created at the station in the long term.PIB
  • Passenger amenities: kiosks for local products under One Station One Product, better passenger information systems, executive lounges, business meeting spaces, and amenities for Divyangjans.PIB
  • Sustainability and design: the scheme envisages environment-friendly solutions, ballastless tracks and roof plazas where needed. A modular sewage treatment plant is planned for a station cited in the evidence.PIB
  • The Ministry of Railways launched the scheme. Project management includes Gati Shakti Units, the Rail Land Development Authority and departmental construction units.

Eligibility and rules

  1. No individual application or eligibility criteria: the scheme benefits every rail passenger who uses a station selected and redeveloped under it; there is no application process for individuals.govtschemesregister.com
  2. Stations are selected by the Ministry of Railways, and the selection is based on passenger footfall, revenue and strategic importance.govtschemesregister.com
  3. Selection is announced in phases, so a station that is not yet selected may be taken up in a later round.govtschemesregister.com

Static GK

  • Pradhan Mantri Gati Shakti (National Master Plan for Multi-modal Connectivity): announced by PM on 15 August 2021, launched 13 October 2021, approved by the Cabinet Committee on Economic Affairs on 21 October 2021; a digital platform for integrated planning of ministries including Railways.
  • Indian Railways: a departmental undertaking of the Ministry of Railways, which operates India's national railway system; the first passenger train ran in 1853 between Bombay and Thane.
  • Ministry of Railways: parent ministry of the Amrit Bharat Station Scheme.

Comparison

Amrit Bharat Station Scheme vs Adarsh Station Scheme

BasisAmrit Bharat Station SchemeAdarsh Station Scheme
Stations covered1309 (India.gov.in); 1275 in the Wikipedia lead1253 (Wikipedia)
FocusComprehensive, phased redevelopment on master plans, city integration, local architectureImproving passenger amenities and upgrading existing stations
Launch / introductionLaunched 6 August 2023 by PM (PIB)Introduced before ABSS (Wikipedia, no date given)
Implementing bodyMinistry of Railways, with Gati Shakti Units, RLDA and construction unitsNot stated in the sources opened

Achievements

  • On 22 May 2025, PM Narendra Modi inaugurated 103 redeveloped stations across 18 States and UTs.
  • On 18 July 2026, 75 more redeveloped stations across 20 States were inaugurated at a combined cost of ₹1,570 crore.
  • Kanpur Central Railway Station is being modernised under the scheme, with work progressing rapidly according to the Railway Minister.Indian Express

Challenges

  • Large, multi-phase projects spread across hundreds of stations need strong coordination between zones, divisions, Gati Shakti Units and construction units.
  • Redevelopment must be balanced against day-to-day operations at busy stations, so work has to be phased carefully.
  • Stations in smaller towns may get less attention than major hubs, which can widen regional differences in facilities.

Way forward

  • Monitor outcomes at each station against its master plan, so progress is measured on passenger experience and not only on completed works.
  • Link station redevelopment with local product sales and city planning, so stations act as city centres and not only as travel points.
  • Use convergence with other schemes such as Gati Shakti and One Station One Product to fund and plan the wider area around each station.

Timeline

  1. December 2026

    Ministry of Railways set December 2026 as the target to bring redeveloped stations to over 400 (planned milestone).

  2. 16 November 2026

    Kanpur Central Station is being modernised under the scheme, and the DPR and approvals for a 16-km elevated corridor at Anwarganj-Mandhana are complete, with construction expected shortly.

    Read the story
  3. 18 July 2026

    75 additional redeveloped stations across 20 States inaugurated.

  4. 22 May 2025

    PM inaugurated 103 redeveloped stations across 18 States and UTs, first major phase of completed works.

  5. 24 September 2023

    Phase 1 of the scheme started.

  6. 6 August 2023

    PM Narendra Modi launched the Amrit Bharat Station Scheme and laid foundation stone for 508 stations.PIB

  7. June 1999

    Model Station Scheme introduced, covering 594 stations (predecessor scheme, since completed).

Every new story on this subject is added here automatically.

Frequently asked questions

How many stations does the scheme cover?

The scheme aims to redevelop 1309 railway stations nationwide, as stated on the National Portal of India.india.gov.in

Which ministry runs the Amrit Bharat Station Scheme?

The Ministry of Railways runs the scheme.

GS paper mapping

  • GS-2Government policies and interventions for development in sectors such as infrastructure and transport
  • GS-3Infrastructure: transport (railways) and urban planning

Sources

Every fact on this page was checked against these pages.

  1. PIB
  2. Indian Express
  3. india.gov.in
  4. govtschemesregister.com

Latest stories on this subject