Indian Railways has moved from earlier station schemes that mostly upgraded passenger amenities to a comprehensive, phased redevelopment model. The Amrit Bharat Station Scheme (ABSS) is designed around master plans for each station, covering multimodal integration, better links with the surrounding city and station designs that reflect local architecture and culture.
The scheme envisages phased improvements, multimodal integration and the creation of city centres at stations in the long term.PIB
In the story, Kanpur Central Railway Station is being modernised under this scheme, alongside a 16-km elevated corridor between Anwarganj and Mandhana that is meant to ease level-crossing congestion.Indian Express
Amrit Bharat Station Scheme: quick facts
- Launch date
- Launched by PM Narendra Modi on 6 August 2023
- Parent ministry
- Ministry of Railways
- Stations covered
- 1309 railway stations nationwide
Key facts
| Launch date | Launched by PM Narendra Modi on 6 August 2023PIB |
|---|---|
| Parent ministry | Ministry of Railways |
| Stations covered | 1309 railway stations nationwideindia.gov.in |
| Nature of scheme | Phased redevelopment with a long-term visionPIB |
| First phase inauguration | 103 stations across 18 States and UTs inaugurated on 22 May 2025 at a cost of over ₹1,100 crore |
| Predecessor scheme | Adarsh Station Scheme (covering 1253 stations), which mainly focused on passenger amenities |
Key features and how it works
- Master-plan based redevelopment: each station gets a master plan, implemented in phases to improve access, circulating areas, waiting halls, toilets, lifts and escalators, cleanliness, free Wi-Fi and landscaping.PIB
- Multimodal integration and city connectivity: the station is integrated with both sides of the city, with multimodal links and city centres created at the station in the long term.PIB
- Passenger amenities: kiosks for local products under One Station One Product, better passenger information systems, executive lounges, business meeting spaces, and amenities for Divyangjans.PIB
- Sustainability and design: the scheme envisages environment-friendly solutions, ballastless tracks and roof plazas where needed. A modular sewage treatment plant is planned for a station cited in the evidence.PIB
- The Ministry of Railways launched the scheme. Project management includes Gati Shakti Units, the Rail Land Development Authority and departmental construction units.
Eligibility and rules
- No individual application or eligibility criteria: the scheme benefits every rail passenger who uses a station selected and redeveloped under it; there is no application process for individuals.govtschemesregister.com
- Stations are selected by the Ministry of Railways, and the selection is based on passenger footfall, revenue and strategic importance.govtschemesregister.com
- Selection is announced in phases, so a station that is not yet selected may be taken up in a later round.govtschemesregister.com
Static GK
- Pradhan Mantri Gati Shakti (National Master Plan for Multi-modal Connectivity): announced by PM on 15 August 2021, launched 13 October 2021, approved by the Cabinet Committee on Economic Affairs on 21 October 2021; a digital platform for integrated planning of ministries including Railways.
- Indian Railways: a departmental undertaking of the Ministry of Railways, which operates India's national railway system; the first passenger train ran in 1853 between Bombay and Thane.
- Ministry of Railways: parent ministry of the Amrit Bharat Station Scheme.
Comparison
Amrit Bharat Station Scheme vs Adarsh Station Scheme
| Basis | Amrit Bharat Station Scheme | Adarsh Station Scheme |
|---|---|---|
| Stations covered | 1309 (India.gov.in); 1275 in the Wikipedia lead | 1253 (Wikipedia) |
| Focus | Comprehensive, phased redevelopment on master plans, city integration, local architecture | Improving passenger amenities and upgrading existing stations |
| Launch / introduction | Launched 6 August 2023 by PM (PIB) | Introduced before ABSS (Wikipedia, no date given) |
| Implementing body | Ministry of Railways, with Gati Shakti Units, RLDA and construction units | Not stated in the sources opened |
Achievements
- On 22 May 2025, PM Narendra Modi inaugurated 103 redeveloped stations across 18 States and UTs.
- On 18 July 2026, 75 more redeveloped stations across 20 States were inaugurated at a combined cost of ₹1,570 crore.
- Kanpur Central Railway Station is being modernised under the scheme, with work progressing rapidly according to the Railway Minister.Indian Express
Challenges
- Large, multi-phase projects spread across hundreds of stations need strong coordination between zones, divisions, Gati Shakti Units and construction units.
- Redevelopment must be balanced against day-to-day operations at busy stations, so work has to be phased carefully.
- Stations in smaller towns may get less attention than major hubs, which can widen regional differences in facilities.
Way forward
- Monitor outcomes at each station against its master plan, so progress is measured on passenger experience and not only on completed works.
- Link station redevelopment with local product sales and city planning, so stations act as city centres and not only as travel points.
- Use convergence with other schemes such as Gati Shakti and One Station One Product to fund and plan the wider area around each station.
Timeline
December 2026
Ministry of Railways set December 2026 as the target to bring redeveloped stations to over 400 (planned milestone).
16 November 2026
Kanpur Central Station is being modernised under the scheme, and the DPR and approvals for a 16-km elevated corridor at Anwarganj-Mandhana are complete, with construction expected shortly.
Read the story18 July 2026
75 additional redeveloped stations across 20 States inaugurated.
22 May 2025
PM inaugurated 103 redeveloped stations across 18 States and UTs, first major phase of completed works.
24 September 2023
Phase 1 of the scheme started.
6 August 2023
PM Narendra Modi launched the Amrit Bharat Station Scheme and laid foundation stone for 508 stations.PIB
June 1999
Model Station Scheme introduced, covering 594 stations (predecessor scheme, since completed).
Every new story on this subject is added here automatically.
Frequently asked questions
How many stations does the scheme cover?
The scheme aims to redevelop 1309 railway stations nationwide, as stated on the National Portal of India.india.gov.in
Which ministry runs the Amrit Bharat Station Scheme?
The Ministry of Railways runs the scheme.
GS paper mapping
- GS-2Government policies and interventions for development in sectors such as infrastructure and transport
- GS-3Infrastructure: transport (railways) and urban planning
Sources
Every fact on this page was checked against these pages.
