AMRUT 2.0 is a Union Ministry of Housing and Urban Affairs scheme that provides water supply and sewerage/septage coverage to urban households in statutory towns and cities, for states and UTs.

Updated: 24 November 20261 topicUPPSCUPSSSC PETUPPSC RO/ARO

The mission aims to ensure every household has access to a tap with assured water supply and a sewerage connection, and to increase the amenity value of cities through greenery and well-maintained open spaces.

In the news, the Uttar Pradesh government plans to provide sewer connections to 416,000 urban homes under AMRUT 2.0. Of a planned 1,751.52 km sewer network, 827.41 km is already built, and eight sewage treatment plants (201 million litres per day) and 16 water treatment plants (326.25 million litres per day) are under construction.Hindustan

Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0): quick facts

Launch date
AMRUT 2.0 was launched on 1 October 2021 for five years, FY 2021-22 to FY 2025-26.
Parent ministry
Ministry of Housing and Urban Affairs (MoHUA), Government of India.
Total outlay
Total indicative outlay of ₹2,99,000 crore, including Central outlay of ₹76,760 crore for five years.

Key facts

Launch dateAMRUT 2.0 was launched on 1 October 2021 for five years, FY 2021-22 to FY 2025-26.PIB
Parent ministryMinistry of Housing and Urban Affairs (MoHUA), Government of India.PIB
Total outlayTotal indicative outlay of ₹2,99,000 crore, including Central outlay of ₹76,760 crore for five years.PIB
CoverageUniversal water supply through functional taps to all households in all statutory towns; sewerage/septage management in 500 cities of the first phase.PIB
Uttar Pradesh target416,000 urban homes to get sewer connections in Uttar Pradesh, as announced by the state government (story).Hindustan

Key features and how it works

  • Universal coverage of water supply through functional taps to all households in all statutory towns across the country.PIB
  • Coverage of sewerage and septage management in the 500 cities covered in the first phase of AMRUT.PIB
  • Central funds are allocated to states and UTs for AMRUT 2.0 projects and administrative and office expenses. Puducherry's plan under the original AMRUT scheme is fully funded through the Central share.PIB
  • Projects are planned through State Annual Action Plans (SAAP), a consolidated plan of city-level Service Level Improvement Plans of all proposed AMRUT cities in a state.

Static GK

  • Ministry of Housing and Urban Affairs (MoHUA): the Union ministry that runs AMRUT 2.0 and sanctions Central funds to states and UTs.PIB
  • State Annual Action Plan (SAAP): consolidated plan of all city-level SLIPs of AMRUT cities in a state; the basis for project approval.
  • City Mission Management Unit (CMMU): unit set up at each city to assist the Urban Local Body with staff and technology (first phase design).

Comparison

AMRUT 2.0 vs Swachh Bharat Mission-Urban 2.0 vs AMRUT (first phase)

BasisAMRUT 2.0Swachh Bharat Mission-Urban 2.0AMRUT (first phase)
FocusWater supply and sewerage/septage coverageGarbage-free cities through source segregation, door-to-door collection and scientific waste managementSewerage networks and water supply for urban transformation
Launch1 October 20211 October 2021June 2015
PeriodFive years, FY 2021-22 to FY 2025-26Five yearsNot stated in sources opened
Implementing bodyMinistry of Housing and Urban AffairsMinistry of Housing and Urban AffairsMinistry of Urban Development (per Wikipedia)

Achievements

  • Uttar Pradesh has built 827.41 km of its planned 1,751.52 km sewer network and is building 8 sewage treatment plants.Hindustan

Challenges

  • Sewer lines are built, but treatment and connection to homes must keep pace, otherwise untreated wastewater still reaches rivers and ponds.
  • Regional imbalance is likely: large states such as Uttar Pradesh need far bigger allocations than small states and UTs.

Way forward

  • Support weaker ULBs with technical staff and planning assistance, drawing on the first phase's proposal for City Mission Management Units to assist ULBs with staff and technology.
  • Converge AMRUT 2.0 with Swachh Bharat Mission-Urban 2.0 and other schemes so that water, sewerage and waste management work together.Hindustan

Timeline

  1. 23 November 2026

    Uttar Pradesh plans sewer connections for 416,000 urban homes under AMRUT 2.0, with 827.41 km of a planned 1,751.52 km sewer network already built and treatment plants under construction.

    Read it in full
  2. 1 October 2021

    AMRUT 2.0 launched for five years, FY 2021-22 to FY 2025-26, with a Central outlay of ₹76,760 crore.PIB

  3. June 2015

    AMRUT (first phase) launched by Prime Minister Narendra Modi to build sewerage and water supply in urban areas.

Every new topic on this subject is added here automatically.

Frequently asked questions

When was AMRUT 2.0 launched?

AMRUT 2.0 was launched on 1 October 2021 for five years, from FY 2021-22 to FY 2025-26.PIB

What is the total outlay of AMRUT 2.0?

The total indicative outlay is ₹2,99,000 crore, including a Central outlay of ₹76,760 crore for five years.PIB

Which ministry runs AMRUT 2.0?

The Ministry of Housing and Urban Affairs runs AMRUT 2.0.PIB

GS paper mapping

  • GS-2Government policies and interventions for development in sectors such as health, education, and urban development
  • GS-3Infrastructure: water supply, sanitation and urban infrastructure
  • GS-3Environment: pollution control and protection of rivers and water bodies

Sources

Every fact on this page was checked against these pages.

  1. Hindustan
  2. PIB

Latest current affairs on this subject