Bharat Audyogik Vikas Yojana (BHAVYA): complete guide

BHAVYA is a Central Sector Scheme of the Government of India to develop 100 investment-ready, plug-and-play industrial parks, for investors and state governments seeking manufacturing infrastructure.

Updated: 18 November 20261 storyMPPSCMPESB

BHAVYA is a Central Sector Scheme run by DPIIT under the Ministry of Commerce and Industry. It aims to develop world-class industrial parks that attract large-scale manufacturing investment and strengthen domestic supply chains.PIB

BHAVYA aims to strengthen India’s manufacturing ecosystem through integrated industrial infrastructure and investment-ready, world-class industrial parks.PIB

The story is relevant because Madhya Pradesh's cabinet cleared a chemical park at Kurlasi under the BHAVYA scheme. The park is one of the state's large industrial projects approved on the same day.Hindustan

Bharat Audyogik Vikas Yojana (BHAVYA): quick facts

Scheme type
Central Sector Scheme, run by DPIIT, Ministry of Commerce and Industry
Outlay
Approximately ₹33,660 crore
Target
100 industrial parks over 2026-27 to 2031-32; up to 50 in the first phase through challenge-based selection

Key facts

Scheme typeCentral Sector Scheme, run by DPIIT, Ministry of Commerce and IndustryPIB
OutlayApproximately ₹33,660 crorePIB
Target100 industrial parks over 2026-27 to 2031-32; up to 50 in the first phase through challenge-based selectionPIB
Project Management AgencyNational Industrial Corridor Development Corporation (NICDC)PIB
Minimum land100 acres for non-hilly states; 25 acres for hilly states, northeastern states, Union Territories and smaller states; larger parks up to 1000 acres permittedPIB
Guidelines released23 May 2026PIB

Key features and how it works

  • Develops plug-and-play industrial parks with multimodal logistics, reliable utilities, worker-support infrastructure, digital governance and sustainable features.PIB
  • Supports both greenfield and eligible brownfield industrial parks.PIB
  • Proposals are judged in a challenge-based competitive selection on connectivity, site suitability, infrastructure quality, industrial ecosystem strength, policy facilitation, digital readiness and sustainability.PIB
  • Each park is implemented through a Special Purpose Vehicle (SPV) under the Companies Act, 2013, which handles planning, development, investor facilitation and long-term maintenance.PIB
  • Financial assistance is provided as an equity contribution linked to the value of land transferred to the SPV and achievement of prescribed project milestones.PIB
  • Monitoring uses GIS-based systems, periodic progress reporting and audits, with oversight by a National Level Steering Committee chaired by the DPIIT Secretary.PIB

Eligibility and rules

  1. Eligible proposals must meet the minimum land norm of 100 acres in non-hilly states, or 25 acres in hilly states, northeastern states, Union Territories and smaller states.PIB
  2. Greenfield parks and eligible brownfield parks are both allowed.PIB

Static GK

  • National Industrial Corridor Development Corporation (NICDC): designated Project Management Agency for implementing and monitoring BHAVYA; role is implementation and monitoring of the scheme.PIB
  • Special Purpose Vehicle (SPV): a project company incorporated under the Companies Act, 2013, that runs each BHAVYA park.PIB
  • BHAVYA Rasayan is a scheme of the Department of Chemicals and Petrochemicals for dedicated chemical parks. It was notified in the Gazette of India on 10 August 2026.chemicals.gov.in

Comparison

BHAVYA vs PM MITRA Textile Parks

BasisBHAVYAPM MITRA
Ministry / bodyDPIIT, Ministry of Commerce and Industry; implemented by NICDCMinistry of Textiles
Purpose100 general industrial parks7 mega integrated textile parks
Financial supportEquity linked to land transferred to SPV and milestones; total outlay about ₹33,660 croreDevelopment Capital Support up to ₹500 crore per park to the Park SPV; Competitive Incentive Support up to ₹300 crore per park to units
Land normMinimum 100 acres (non-hilly states); 25 acres (hilly/NE/UT/smaller states)At least 1000 acres of contiguous land, provided by the state
Park sitesSelected through challenge-based competition; first phase up to 50 parks7 sites in Tamil Nadu, Telangana, Gujarat, Karnataka, Madhya Pradesh, Uttar Pradesh and Maharashtra, chosen from 18 proposals

Achievements

  • Guidelines for the scheme were released on 23 May 2026, which moved it into operation.PIB
  • The scheme's design brings private developers into park development, which can add investment and expertise to public money.
  • Madhya Pradesh approved a chemical park at Kurlasi under BHAVYA, projected to attract ₹15,000 crore in investment and provide employment for 100,000 people.Hindustan

Challenges

  • Land must be contiguous and available. Minimum land norms for non-hilly states are high, so state land assembly can slow projects.
  • Parks will be spread across states, so regional imbalance in investment may persist unless the selection process gives weight to less-developed regions.
  • Parks that fail to attract anchor units may not survive long-term, so the SPV model depends on sustained occupancy.

Way forward

  • The guidelines provide for GIS-based monitoring, periodic progress reporting and audit mechanisms.PIB
  • Handholding of SPVs in project planning and investor facilitation can help weaker parks reach occupancy.
  • The guidelines provide for convergence with relevant Central and State initiatives for logistics, skilling, renewable energy and utility infrastructure.PIB

Timeline

  1. 18 November 2026

    Madhya Pradesh Cabinet cleared a chemical park at Kurlasi, Mandsaur, under BHAVYA, projected to attract ₹15,000 crore investment and 100,000 jobs.

    Read the story
  2. 10 August 2026

    Gazette notification of the BHAVYA Rasayan scheme issued.chemicals.gov.in

  3. 23 May 2026

    DPIIT released the operational guidelines for BHAVYA.PIB

Every new story on this subject is added here automatically.

Frequently asked questions

What is the outlay of BHAVYA?

BHAVYA has a total financial outlay of approximately ₹33,660 crore for developing 100 industrial parks over 2026-27 to 2031-32.PIB

Which agency implements BHAVYA?

The National Industrial Corridor Development Corporation (NICDC) is the Project Management Agency for implementing and monitoring BHAVYA.PIB

How many parks will BHAVYA develop in its first phase?

Up to 50 industrial parks will be taken up in the first phase through challenge-based competitive selection.PIB

GS paper mapping

  • GS-2Government policies and interventions for development in various sectors and issues arising out of their design and implementation
  • GS-3Industrial growth, infrastructure, investment models
  • GS-3Make in India and manufacturing sector

Sources

Every fact on this page was checked against these pages.

  1. PIB
  2. Hindustan
  3. chemicals.gov.in

Latest stories on this subject