The Light Combat Aircraft programme was set up in 1983 by the Government of India to develop a new light combat aircraft to replace the ageing fleet of the IAF, which was operating fighters such as the MiG-21 since 1963.
The programme was built to cut India's dependence on foreign fighters. The Tejas was designed by the Aeronautical Development Agency and is manufactured by HAL, so the aircraft is a national project from design to production.
The Mk-1A is now the variant in focus. It is designed to replace the MiG-21 fleet, which retired after more than six decades of service.Hindustan

Key facts
| Set up | 1983 by the Government of India |
|---|---|
| Design agency | Aeronautical Development Agency (ADA), under the Department of Defence Research and Development; established in Bangalore in 1984; affiliate of DRDO |
| Principal contractor | Hindustan Aeronautics Limited (HAL) |
| First flight | 4 January 2001 (technology demonstrator TD-1) |
| Entry into IAF service | 2015 (No. 45 Squadron became operational in 2016) |
| Mk-1A induction target | One squadron in FY 2026-27 (Air Chief Marshal Ashutosh Dixit)Hindustan |
Key features and how it works
- The Tejas is a single-engine, 4.5 generation, delta wing, multirole combat aircraft.
- The aircraft has two production combat variants, Mark 1 and Mark 1A, plus trainers. Initial Mk-1A aircraft use the Elta EL/M-2052 AESA radar, while other aircraft are expected to use the indigenous Uttam AESA radar.
- Indigenous content of the Mk-1A is over 64% under the 97-aircraft contract, and the contract is an 'Buy (India-IDDM)' procurement under the Defence Acquisition Procedure 2020.PIB
- The 2021 contract is the first 'Buy (Indian-Indigenously Designed Developed and Manufactured)' procurement of combat aircraft, with indigenous content of 50% rising to 60% by the end of the programme.PIB
- Under the 2021 contract HAL was to deliver the first 3 aircraft in the third year and 16 aircraft per year for the following five years. Its second production plant (Plant II) in Bengaluru was inaugurated in February 2021 to raise capacity.PIB
- The Mk-2 (Medium Weight Fighter) is a further development with an elongated airframe, close-coupled canards and a more powerful engine. Its first flight has been delayed several times.
Static GK
- Aeronautical Development Agency (ADA): established 1984 in Bangalore, under the Department of Defence Research and Development (DR&D), Ministry of Defence; an affiliate of DRDO that designs the Tejas, Tejas Mk2 and AMCA.
- Hindustan Aeronautics Limited (HAL): founded as Hindustan Aircraft Limited on 23 December 1940 by Walchand Hirachand, renamed Hindustan Aeronautics Limited on 1 October 1964, headquartered in Bengaluru, a public sector company majority-owned by the Government of India; it is the principal contractor for the Tejas.
- Defence Research and Development Organisation (DRDO): its Electronics and Radar Development Establishment (LRDE) and the Centre for Airborne Systems worked on the LCA multi-mode radar, and DRDO started the Uttam AESA radar in 2012.
- Defence Acquisition Procedure 2020: the procurement framework under which the Mk-1A contract was made in the 'Buy (India-IDDM)' category.PIB
Achievements
- The 2021 contract of about ₹48,000 crore for 83 Mk-1A aircraft was described by PIB as the largest ever defence contract for indigenous manufacture up to that date.PIB
- The 2025 contract for 97 Mk-1A aircraft (68 fighters and 29 twin seaters) cost over ₹62,370 crore excluding taxes, involves about 105 Indian vendors and is expected to generate close to 11,750 direct and indirect jobs per year.PIB
- The Tejas is the second jet-powered combat aircraft developed by HAL, after the HF-24 Marut. No. 45 Squadron operates it at Sulur, and No. 18 Squadron was formed at Sulur with Tejas aircraft.
Challenges
- Earlier production deadlines for the Mk-1A were missed, so timely induction is a concern, as the IAF faces a serious shortage of fighter aircraft.Hindustan
- The Mk-2 programme has seen repeated slippage. The December 2023 revised schedule pushed the first test flight to around 2028, and the government raised the indigenisation requirement from 65% to 80%.
- The Tejas Mk-2 programme is tied to the American GE F414 engine.
Way forward
- Convergence of the Mk-2 and AMCA programmes with the indigenous radar and engine work, so that the lessons of the Mk-1A are used in the next generation of fighters.
Timeline
16 November 2026
Air Chief Marshal Ashutosh Dixit announced one Mk-1A squadron will be inducted in FY 2026-27, with 180 Mk-1A aircraft ordered from HAL in two orders worth ₹1.1 lakh crore.
Read the story25 September 2025
MoD signs a contract worth over ₹62,370 crore excluding taxes with HAL for 97 LCA Mk1A aircraft.PIB
3 February 2021
₹48,000 crore contract for 83 LCA Mk-1A handed over to HAL at Aero India 2021.PIB
2015
Tejas enters service with the IAF; No. 45 Squadron becomes operational in 2016.
November 2009
Development of the Tejas Mk-2 (MWF) is authorised as a continuation of the LCA programme.
2003
The aircraft is officially named Tejas, and the first production variant (PV-1) makes its maiden flight.
4 January 2001
First technology demonstrator (TD-1) achieves flight.
1984
Aeronautical Development Agency is set up in Bangalore under the Department of Defence Research and Development to oversee the LCA programme; it is an affiliate of DRDO.
1983
Government of India establishes the Light Combat Aircraft programme to replace the ageing IAF fleet.
Every new story on this subject is added here automatically.
Frequently asked questions
Who manufactures the Tejas?
Hindustan Aeronautics Limited (HAL) manufactures the Tejas, and the Aeronautical Development Agency designed it.
Which aircraft is the Mk-1A meant to replace?
The Mk-1A is designed to replace the MiG-21 fleet, which retired after more than six decades of service.Hindustan
GS paper mapping
- GS-3Indigenisation of defence production, Make in India and Aatmanirbhar Bharat
- GS-3Defence technology and DRDO's role in indigenous systems
- GS-2Government policies and schemes on defence procurement (Defence Acquisition Procedure)
Sources
Every fact on this page was checked against these pages.