Super Current Affairs

Report

National Electricity Plan (NEP 2017-22): complete guide

The National Electricity Plan is a planning report of the Central Electricity Authority under the Ministry of Power, covering generation and transmission planning, and the 2017-22 edition ruled out fresh thermal capacity beyond 2022 apart from projects under construction.

Updated: 19 November 20261 storyUPSC

The CEA was established under the Electricity (Supply) Act, 1948 and continued under the Electricity Act, 2003, under which it formulates plans for the development of generation, transmission and distribution.

The 2017-22 edition of the plan focused on renewables and discouraged imported coal-based projects, as rising global coal prices made such projects costly. In 2026, the CEA revisited the need for coal capacity as a power shortage risk emerged.Indian Express

National Electricity Plan (NEP 2017-22): quick facts

Legal basis
Electricity (Supply) Act, 1948; continued under the Electricity Act, 2003
Plan period
2017-22
Thermal policy
Ruled out fresh thermal capacity beyond 2022, apart from 50 GW of under-construction projects

Key facts

Legal basisElectricity (Supply) Act, 1948; continued under the Electricity Act, 2003
Plan period2017-22Indian Express
Thermal policyRuled out fresh thermal capacity beyond 2022, apart from 50 GW of under-construction projectsIndian Express
Coal capacity need by 2035105-150 GW, against 97 GW currently planned (CEA chairperson flagged this on 13 October)Indian Express

Key features and how it works

  • The 2017-22 edition ruled out fresh thermal capacity additions beyond 2022, apart from 50 GW of projects already under construction, and focused on renewables.Indian Express
  • Imported coal-based projects were discouraged under the plan amid rising global coal prices.Indian Express

Static GK

  • Central Electricity Authority: statutory body under the Ministry of Power, advising the Government of India on electricity sector planning, technical standards and grid integration.
  • Electricity (Supply) Act, 1948: established the Central Electricity Authority for planning at the central level and State Electricity Boards at the state level.
  • Electricity Act, 2003: consolidated earlier legislation, mandated the unbundling of State Electricity Boards, de-licensed generation and distribution, and introduced open access in transmission.
  • Grid India’s daily frequency profile data showed grid frequency falling below 49.9 Hz, including during solar hours.Indian Express

Achievements

  • India has integrated its five regional grids into a single national grid, a planning and operational achievement of the 2010s.

Challenges

  • Coal stocks at domestic coal-based plants fell to 20.79 million tonnes on 15 November 2026, raising fears of a power shortage, which shows the risk of a plan that limited new thermal capacity.Indian Express
  • The plan's thermal restriction faces a gap, since the CEA now sees a need for 105-150 GW of coal capacity by 2035 against 97 GW planned.Indian Express
  • The distribution segment faces financial stress due to high technical and commercial losses and a gap between the average cost of supply and average revenue realised.

Way forward

  • Plan revisions should align the thermal capacity forecast with demand and baseload needs, as the 2035 coal gap suggests.Indian Express
  • Coal storage expansion at thermal plants, from 80 to 160 million tonnes, is a key step for securing supply ahead of summer peaks.Indian Express
  • Monitoring of grid frequency and coal stock levels can give early warning of shortages, so plan revisions respond in time.

Timeline

  1. 18 November 2026

    Coal stocks at domestic plants fell to 20.79 million tonnes, and the Centre discussed doubling coal storage to 160 million tonnes amid fears of a summer power shortage, with CEA flagging 105-150 GW of coal capacity needed by 2035.

    Read the story
  2. 13 October 2026

    CEA chairperson flags the need to add 105-150 GW of coal-based capacity by 2035 at a meeting.Indian Express

  3. 2017

    National Electricity Plan for 2017-22 begins its plan period, focusing on renewables and ruling out fresh thermal capacity beyond 2022 apart from 50 GW under construction.Indian Express

  4. 2003

    The Electricity Act, 2003 continues the CEA and gives it responsibility for formulating electricity development plans.

  5. 1948

    Electricity (Supply) Act, 1948 establishes the Central Electricity Authority for central-level planning.

Every new story on this subject is added here automatically.

Frequently asked questions

Did the NEP 2017-22 allow new coal plants after 2022?

No, the plan ruled out fresh thermal capacity beyond 2022, apart from 50 GW of projects already under construction.Indian Express

How much coal capacity does the CEA now say is needed by 2035?

The CEA says 105-150 GW of coal-based capacity is needed by 2035, against 97 GW currently planned.Indian Express

GS paper mapping

  • GS-3Energy: conventional and non-conventional sources, power sector planning
  • GS-2Government policies and institutions: statutory bodies (CEA) and their functions

Sources

Every fact on this page was checked against these pages.

  1. Indian Express

Latest stories on this subject