Hydropower uses the natural flow of water to generate electricity. Small hydropower (SHP) covers projects up to 25 MW and suits hilly and remote areas where terrain and grid reach limit larger projects. Such projects need little land, cause minimal displacement and have a long operating life.PIB
The scheme exists to expand clean energy in underserved regions. The Government has identified a potential of 21,134 MW across 7,133 sites, of which about a quarter is harnessed. The scheme targets financing, project readiness and execution constraints, especially in difficult geographies.PIB
Small Hydro Power (SHP) Development Scheme: quick facts
- Full form
- Small Hydro Power (SHP) Development Scheme; SHP means projects up to 25 MW
- Nodal ministry
- Ministry of New and Renewable Energy (MNRE); large hydro above 25 MW falls under the Ministry of Power
- Outlay
- ₹2,584.60 crore for FY 2026-27 to FY 2030-31
Key facts
| Full form | Small Hydro Power (SHP) Development Scheme; SHP means projects up to 25 MWPIB |
|---|---|
| Nodal ministry | Ministry of New and Renewable Energy (MNRE); large hydro above 25 MW falls under the Ministry of PowerPIB |
| Outlay | ₹2,584.60 crore for FY 2026-27 to FY 2030-31PIB |
| Capacity target | About 1,500 MW of new small hydro capacityPIB |
| Identified potential | 21,134 MW across 7,133 sites, of which about 5,182 MW had been harnessed as of 30 September 2026PIB |
| DPR support | ₹30 crore for preparing Detailed Project Reports for at least 200 projectsPIB |
| Expected investment | About ₹15,000 crorePIB |
Key features and how it works
- Financial assistance for North-Eastern states and international border districts: ₹3.6 crore per MW or 30% of project cost, whichever is lower, subject to a ceiling of ₹30 crore per project.PIB
- Financial assistance for other locations: ₹2.4, ₹1.78 or ₹2.054 crore per MW depending on the size and location of the project, or 20% of project cost, whichever is lower, with a cap of ₹20 crore per project.PIB
- Project preparation support: ₹30 crore, allocated separately, to prepare Detailed Project Reports for a minimum of 200 projects, so central and state agencies can build a future pipeline.PIB
- Technical capacity building, alongside financial assistance, to support implementation and project viability.PIB
- Promotes indigenous plant and machinery, linked to the Atmanirbhar Bharat vision and local manufacturing.PIB
Eligibility and rules
Static GK
- Ministry of New and Renewable Energy: headquartered at Lodi Road, New Delhi; established as the Ministry of Non-Conventional Energy Sources in 1992 and renamed in October 2006; nodal ministry for small hydro, wind, solar, biogas and related sources.
- Indian Renewable Energy Development Agency (IREDA): formed in 1987, a Navratna Non-Banking Financial Institution under the administrative control of MNRE, which provides financial assistance for renewable energy and energy efficiency projects.
- India categorises hydro projects up to 25 MW as small hydro; definitions vary by country.
Achievements
- The scheme is expected to attract investments of around ₹15,000 crore in the small hydro sector.PIB
- It is expected to generate about 51 lakh person-days of employment during construction, plus sustained operation and maintenance jobs in rural and remote areas.PIB
- Small hydro has been a grid-connected renewable source; MNRE's 2016-17 annual report records 4,333.85 MW of small hydro deployed by December 2016.
Challenges
- Small hydro projects in remote and hilly areas face difficult terrain and weak grid connection, which raises project costs and execution time.
- Financing is a constraint. The scheme provides assistance linked to project cost, subject to per-project caps.PIB
- Project readiness is a constraint. The scheme supports Detailed Project Reports for at least 200 projects; about a quarter of identified small hydro capacity has been harnessed.PIB
Way forward
- Outcome monitoring against the capacity target and the DPR pipeline, so that the outlay translates into commissioned projects.
- Handholding for state agencies and developers in preparing DPRs and clearances in hilly and border districts.
- Convergence with state nodal agencies, IREDA's financing role and manufacturing schemes so that projects get finance and indigenous equipment together.
Timeline
22 November 2026
Government approved the Small Hydro Power Development Scheme with a ₹2,584.60 crore outlay for FY 2026-27 to FY 2030-31, targeting about 1,500 MW of new capacity, prioritising hilly, North-Eastern and border regions.
Read the storyOctober 2006
Ministry renamed Ministry of New and Renewable Energy.
1992
Ministry of Non-Conventional Energy Sources (later MNRE) established.
Every new story on this subject is added here automatically.
Frequently asked questions
What is the capacity limit for a small hydro project under this scheme?
A small hydro project has an installed capacity of up to 25 MW; larger projects fall under the Ministry of Power.PIB
What is the outlay and target of the scheme?
The scheme has an outlay of ₹2,584.60 crore for FY 2026-27 to FY 2030-31 and aims to add about 1,500 MW of capacity.PIB
Which ministry runs the scheme?
The Ministry of New and Renewable Energy is the nodal ministry for the scheme.PIB
GS paper mapping
- GS-3Infrastructure: energy
- GS-3Renewable energy and energy security
- GS-2Government policies and interventions for development in regional areas (hilly, North-East, border)
Sources
Every fact on this page was checked against these pages.