For Prelims: Non-fossil fuel capacity, PM-KUSUM Scheme, Installed capacity vs. generation, Viksit Bharat 2047
For Mains: Energy transition, decarbonisation, renewable energy ecosystem, prosumer, Viksit Bharat 2047
New update
New facts from PIB, 17 November 2026
- Solar capacity reached ~175 GW as of 31 October 2026 (vs 171 GW in earlier story)
- India added 44.61 GW of solar capacity in FY 2025-26
- Solar module manufacturing capacity increased from 2.3 GW in 2014 to 192 GW by June 2026
- Total non-fossil fuel capacity reached 308.03 GW as of 30 September 2026
- On 29 July 2025, renewable energy sources met 51.5% of India's electricity demand
- Bharat Renewable Energy Summit & Expo (BRESE) 2026 held from 2-5 November 2026 at Bharat Mandapam, New Delhi
- Participants from over 130 countries attended BRESE 2026
5 facts for one-day exams
SSC, railway, police and teaching exams ask direct questions like these.
- India's solar capacity rose from 2.8 GW in 2014 to 171 GW in 2026.
- Solar power cost fell from ₹8/unit in 2014-15 to ₹2.15/unit.
- India is the only G20 nation to meet its 2030 non-fossil target early.
- Over 21 lakh homes got zero electricity bill under PM Surya Ghar scheme.
- India aims for 500 GW non-fossil fuel capacity by 2030.
Why in the news?
India has achieved a 6007% increase in solar capacity from 2.8 GW (2014) to 171 GW (2026), making it the only G20 country to meet its 2030 non-fossil fuel capacity target (50%) five years early. Solar power cost has dropped from ₹8/unit to ₹2.15/unit under the vision of 500 GW non-fossil capacity by 2030, with PM Surya Ghar scheme providing zero bills to over 21 lakh homes.
Summary
- India's installed solar capacity has grown from 2.8 GW in 2014 to 171 GW today, a 6007% increase.
- Solar power cost has fallen from ₹8/unit (2014-15) to as low as ₹2.15/unit, driven by schemes like PM-KUSUM.
- India is the only G20 nation to achieve its 2030 target of 50% non-fossil fuel capacity five years ahead of schedule.
Key Analysis and Impact
The 6007% increase in solar capacity and cost reduction from ₹8 to ₹2.15 per unit have profound implications. For consumers, especially in rural areas, affordable solar power reduces energy poverty and dependence on erratic grid supply. For the economy, it lowers the cost of electricity for industries, enhancing competitiveness. Environmentally, it accelerates decarbonisation, helping India meet its NDC targets. Socially, rooftop solar under PM Surya Ghar is creating a new generation of 'prosumers' who understand energy systems, driving innovation in storage, AI-based grid management, and decentralised solutions.
Solar capacity and cost: 2014 vs 2026
| Parameter | 2014 | 2026 |
|---|---|---|
| Installed solar capacity | 2.8 GW | 171 GW |
| Solar power cost per unit | ₹8 | ₹2.15 |
Background GK
Textbook concepts you need to understand this news
- Non-fossil fuel capacity
- Electricity generated from sources that do not burn fossil fuels (coal, oil, gas). Includes solar, wind, hydro, nuclear, and biomass. India targets 500 GW installed capacity from such sources by 2030.
- PM-KUSUM Scheme
- Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan: A government scheme to promote solar energy among farmers by providing solar pumps and grid-connected solar plants on barren land.
- Installed capacity vs. generation
- Installed capacity (GW) is the maximum power a plant can produce at full output. Actual electricity generation (kWh) depends on capacity utilisation factor (CUF), which for solar is typically 15-25%.
- Viksit Bharat 2047
- The government's vision document for India to become a developed nation by 2047, the 100th year of independence. It includes energy self-sufficiency, economic growth, and infrastructure development.
Facts to remember
Tap a card to see the answer. Try to recall it first.
How exams will ask this
- Data: Solar capacity increase 6007% (2.8 GW to 171 GW); cost ₹8/unit to ₹2.15/unit
- Nodal Body: Ministry of New and Renewable Energy (MNRE)
- Target: 500 GW non-fossil capacity by 2030; 50% non-fossil capacity achieved 5 years early
Common mistake:
Students may confuse 'installed capacity' with 'electricity generation' or swap the percentage (6007%) with a smaller number. Another trap: stating India achieved 500 GW target by 2030 (it has achieved the 50% share target, not the 500 GW absolute target). Also, 'PM Surya Ghar' may be confused with 'PM-KUSUM' or 'Rooftop Solar Programme'.
Write these in mains answers
- Energy transition, decarbonisation, renewable energy ecosystem, prosumer, Viksit Bharat 2047
Stuck? Get it in one tap
India's solar energy has grown massively, with capacity jumping from 2.8 GW in 2014 to 171 GW and power cost dropping from around ₹8/unit in 2014-15 to as low as ₹2.15/unit. This success is attributed in the news to government initiatives including PM Surya Ghar (which has led to over 21 lakh of 65 lakh homes with rooftop solar receiving a zero electricity bill). India is reported to be the only G20 country to have met its 2030 target of 50% non-fossil capacity five years early.
- Environment: Renewable energy sources
- Economy: Energy sector reforms
Related concepts: Non-fossil fuel capacity, PM-KUSUM Scheme, Installed capacity vs. generation, Viksit Bharat 2047
Practice questions
Pick an answer, then read the explanation.
- Q1Easy
Which ministry is primarily responsible for implementing solar energy schemes like PM-KUSUM and PM Surya Ghar in India?
Explanation: The Ministry of New and Renewable Energy (MNRE) is the nodal ministry for all renewable energy policies and schemes in India, including solar power initiatives like PM-KUSUM and PM Surya Ghar Muft Bijli Yojana. The Ministry of Power handles grid management and electricity distribution, while the Ministry of Environment deals with climate change policy.
- Q2Hard
Consider the following statements:
- 1.India's installed solar capacity has increased from 2.8 GW in 2014 to 171 GW in 2026, a rise of about 6007%.
- 2.Solar power cost has fallen from ₹8 per unit in 2014-15 to ₹2.15 per unit in 2026.
- 3.India is the only G20 country to have achieved its 2030 target of 500 GW non-fossil capacity five years early.
Which of the statements given above is/are correct?
Explanation: Statement 1 is correct: Solar capacity rose from 2.8 GW to 171 GW, a 6007% increase. Statement 2 is correct: Cost fell from ₹8/unit to ₹2.15/unit . Statement 3 is incorrect: India achieved its 2030 target of 50% non-fossil capacity share five years early, NOT the absolute 500 GW target. The 500 GW target is for 2030, not yet achieved.
- Q3Medium
, what is India's target for installed power capacity from non-fossil fuel sources by 2030?
Explanation: The news clearly states the vision to achieve 500 GW of installed power capacity from non-fossil fuel sources by 2030. 171 GW is the current solar-only capacity (not total non-fossil).
- Q4Medium
What is the primary objective of the PM Surya Ghar Muft Bijli Yojana ?
Explanation: PM Surya Ghar rooftop solar has resulted in zero electricity bills for over 21 lakh of 65 lakh homes; it does not state the scheme provides 'up to 300 units per month'.
Frequently asked questions
1. What was India's solar capacity in 2014 and what is it now?
India's installed solar capacity has grown from 2.8 GW in 2014 to 171 GW in 2026, a 6007% increase.
2. How much has the cost of solar power fallen in India?
Solar power cost has dropped from around ₹8 per unit in 2014-15 to as low as ₹2.15 per unit in 2026.
3. How many homes have received zero electricity bills under the PM Surya Ghar scheme?
Over 21 lakh out of 65 lakh homes with PM Surya Ghar rooftop solar have received a zero electricity bill.
4. Which G20 country met its 2030 non-fossil fuel capacity target five years early?
India is the only G20 country to have met its 2030 target of 50% non-fossil fuel capacity five years ahead of schedule.
All sources
Original1 November 2026 · Read story
Update17 November 2026 · Read story


