For Prelims: Chief Minister (CM), Assembly Constituency, Financial and Administrative Approval
For Mains: Infrastructure development, Rural drinking water, Temple tourism, Pre-election welfare schemes
Source:Dainik Bhaskar
5 facts for one-day exams
SSC, railway, police and teaching exams ask direct questions like these.
- Total funds approved: ₹22.15 crore
- Number of development works: 26
- Number of districts covered: 7
- Largest allocation district: Dehradun (₹8.96 crore)
- Handpumps to be installed in Haridwar: 100 (50 each in Jhabreda and Laksar)
Why in the news?
Uttarakhand Chief Minister Pushkar Singh Dhami has approved over ₹22.15 crore for 26 development and construction works across seven districts. The focus is on urban roads and drains in Dehradun, handpumps in Haridwar villages, street lights in Kotdwar, and beautification of temples and fair grounds in Almora, Champawat and Tehri.
Summary
- CM Pushkar Singh Dhami approved ₹22.15 crore for 26 development works in 7 Uttarakhand districts.
- Largest allocation: ₹8.96 crore for 12 road and drain projects in Dehradun's Mussoorie constituency.
- 100 handpumps sanctioned for Haridwar villages (50 in Jhabreda, 50 in Laksar).
- Temple beautification and fair ground development funded in Almora, Champawat and Tehri.
Background
This development comes ahead of the Uttarakhand Legislative Assembly elections. The state government has prioritised basic infrastructure in both urban and rural areas. The largest share (₹8.96 crore) goes to the Mussoorie assembly constituency in Dehradun district, focusing on internal roads and drains to address urban flooding and connectivity issues.
Key Analysis and Impact
The allocation reflects a balanced approach: urban infrastructure (Dehradun roads/drains), rural drinking water (Haridwar handpumps), urban lighting (Kotdwar street lights), and cultural tourism (temple beautification in Almora, Champawat, Tehri). The ₹3.44 crore for Pithoragarh includes a fair ground at Nauling in Dharchula, promoting local tourism and cultural events.
Uttarakhand connection
Background GK
Textbook concepts you need to understand this news
- Chief Minister (CM)
- The elected head of the state government, appointed by the Governor, who heads the Council of Ministers.
- Assembly Constituency
- A territorial constituency from which a member is elected to the state legislative assembly.
- Financial and Administrative Approval
- The formal sanction from the competent authority (here, the CM) to spend allocated funds and execute a project.
Facts to remember
Tap a card to see the answer. Try to recall it first.
How exams will ask this
- Data: ₹22.15 crore approved for 26 development works in 7 districts of Uttarakhand.
- Nodal Body: Government of Uttarakhand (Chief Minister Pushkar Singh Dhami).
- Data: 100 handpumps sanctioned for Haridwar (50 each in Jhabreda and Laksar).
Common mistake:
Examiners may ask the number of works (26) or districts (7) or the exact amount (₹22.15 crore) with close distractors like ₹22.50 crore or 25 works. Also, they may swap 'handpumps' with 'tubewells' or 'street lights' with 'solar lights'.
Write these in mains answers
- Infrastructure development, Rural drinking water, Temple tourism, Pre-election welfare schemes
Stuck? Get it in one tap
This story belongs to: Polity
Related concepts: Chief Minister (CM), Assembly Constituency, Financial and Administrative Approval
Practice questions
Pick an answer, then read the explanation.
- Q1Easy
Who is the current Chief Minister of Uttarakhand?
Explanation: Pushkar Singh Dhami is the current Chief Minister of Uttarakhand. Harish Rawat, Trivendra Singh Rawat, and Tirath Singh Rawat are former CMs of the state.
- Q2Hard
Consider the following statements regarding development works approved in Uttarakhand:
- 1.The approved works cover eight districts of Uttarakhand.
- 2.The largest district allocation was made to Haridwar.
- 3.The approved works include the installation of 100 handpumps in Haridwar.
Which of the statements given above is/are correct?
Explanation: 1. False: The works cover seven districts. 2. False: Dehradun received the largest allocation. 3. True: Haridwar is to receive 100 handpumps.
- Q3Medium
What is the total amount approved by the Uttarakhand CM for development works across 7 districts?
Explanation: The CM approved over ₹22.15 crore for 26 development works. ₹20.15 crore, ₹25.15 crore, and ₹18.15 crore are incorrect amounts.
- Q4Medium
What is the primary objective of the handpump installation project in Haridwar?
Explanation: The handpumps are being installed in rural areas of Jhabreda and Laksar assembly constituencies to enhance drinking water facilities. Tourism, temple beautification, and street lighting are separate projects under the same approval.
Frequently asked questions
1. How much did Uttarakhand CM approve for development works?
CM Pushkar Singh Dhami approved over ₹22.15 crore for 26 development and construction works.
2. Which district got the largest share of funds?
Dehradun district, specifically the Mussoorie assembly constituency, got the largest share of ₹8.96 crore for 12 road and drain projects.
3. How many handpumps will be installed in Haridwar?
100 handpumps will be installed in Haridwar district, 50 each in Jhabreda and Laksar assembly constituencies.
4. What is the street light project in Kotdwar?
Kotdwar in Pauri Garhwal district will get street lights at a cost of ₹3.44 crore, including electric poles and line shifting.
All sources
Original3 November 2026 · Read story

