Subject: Infrastructure (Roads and Transport) and Social Justice (Persons with Disabilities)

Key points for Prelims: National Highways Authority of India (NHAI), Standard Operating Procedure (SOP), Foot overbridge (FOB), Ministry of Road Transport and Highways, Pedestrian underpass

Mains syllabus mapping

  • General Studies Paper 2: Government policies and interventions for development in sectors; welfare of vulnerable sections, persons with disabilities and elderly
  • General Studies Paper 3: Infrastructure: roads and national highways; road safety

Key facts for one-day exams

  • NHAI issued a new SOP for foot overbridges on national highways.
  • The SOP makes pedestrian traffic surveys mandatory before FOB construction.
  • Ramps and lifts on FOBs are now compulsory for disabled and elderly persons.
  • NHAI aims to build 1,500-2,000 new FOBs and overpasses.
  • Over 3,000 FOBs currently exist on national highways.

Why in the news?

The NHAI's new SOP for foot overbridges is in the news because it is a fresh central policy that for the first time sets uniform rules for FOB construction, repair and removal on national highways, with a target of 1,500-2,000 new FOBs and overpasses. It matters as it directly addresses pedestrian safety and accessibility for disabled and elderly persons on high-speed corridors.

The National Highways Authority of India (NHAI) has issued a new Standard Operating Procedure (SOP) for foot overbridges (FOBs) on national highways, making pedestrian traffic surveys and technical feasibility studies mandatory before any FOB is constructed, widened or demolished. The SOP, released last week, also sets uniform repair timelines and makes ramps and lifts compulsory on FOBs for the convenience of disabled and elderly persons. The move is aimed at preventing accidents on high-speed highways and providing pedestrians a scientifically designed safe crossing.

According to a senior NHAI official, the new rules end the earlier practice where FOB construction or alteration was done arbitrarily based on local demands. Previously, there was no uniform central policy for maintenance or removal of FOBs, and repairs often took years due to negligence by local bodies or contractors. During highway widening, pedestrian crossings were sometimes removed without providing alternatives. The target is also to build 1,500 to 2,000 new modern FOBs and overpasses in the coming years to address population pressure and highway widening. Safe pedestrian underpasses equipped with CCTV and drainage systems are also being prioritised where climbing stairs is difficult. Currently, there are over 3,000 FOBs on national highways across the country.

What is the Vision Zero road safety policy?

Vision Zero is a road safety strategy that originated in Sweden in 1997, based on the ethical principle that no one should be killed or seriously injured while using the road transport system. It shifts responsibility from individual road users to system designers, requiring roads, vehicles and speeds to be managed so that human error does not lead to fatal outcomes. The Safe System Approach, adopted by countries like the US, UK and EU members, operationalises this by integrating safer roads, safer speeds, safer vehicles and post-crash care. India’s new SOP for foot overbridges, with its emphasis on pedestrian surveys, universal accessibility and dedicated crossing structures, reflects elements of this systemic safety thinking adapted to high-speed national highway conditions.

What was the earlier arrangement?

Before this SOP, there was no uniform central policy for the maintenance, repair or removal of foot overbridges on national highways. Local bodies and contractors often delayed repairs by years, and during highway widening, pedestrian crossings were removed without providing alternative arrangements, leading to accidents. The new policy aims to end this ad-hoc approach by making pedestrian counts and technical feasibility studies mandatory before FOB construction, widening or demolition.

How does the new policy improve safety and accessibility?

The SOP mandates pedestrian traffic surveys and technical feasibility studies before any FOB construction, widening or demolition, preventing arbitrary decisions. It sets uniform repair timelines to ensure timely maintenance. The compulsory provision of ramps and lifts for disabled and elderly persons aligns with the Rights of Persons with Disabilities Act, 2016, and the target of 1,500-2,000 new FOBs and overpasses will improve connectivity and safety for populations near highways. Pedestrian underpasses equipped with CCTV and drainage systems are also a priority where climbing stairs is difficult. The policy also brings India closer to global standards like the Vision Zero and Safe System Approach used in the US, UK and EU, though India's focus on FOBs and underpasses is tailored to its high-speed highway geography.

Key terms

National Highways Authority of India (NHAI):
An autonomous agency under the Ministry of Road Transport and Highways, responsible for the development, maintenance and management of national highways in India.
Foot Overbridge (FOB):
A pedestrian bridge built over a road or highway to allow safe crossing without interfering with vehicular traffic.
Universal Accessibility:
Designing infrastructure, products and services to be usable by all people, including those with disabilities, to the greatest extent possible without need for adaptation.

Why it matters for exams

Syllabus: Governance: Infrastructure and public policy; Society: Welfare of persons with disabilities

Common mistake: Examiners may ask for the target number of new FOBs and overpasses (1,500-2,000) vs the number of FOBs currently existing (over 3,000), or confuse NHAI with the Ministry of Housing and Urban Affairs which handles city roads.

Mains practice questions

Question 1(GS-3 | 250 words | 15 marks)

The NHAI's new SOP mandating pedestrian surveys, ramps and lifts on foot overbridges reflects a shift from arbitrary local decisions to uniform central planning. Critically examine how such standardisation can improve pedestrian safety and accessibility on national highways, and what challenges may limit its implementation.

Answer outline

  • Introduction: Open by noting that the NHAI has, for the first time, issued a uniform SOP governing construction, repair and removal of foot overbridges on national highways, responding to ad hoc practices and pedestrian risk on high-speed corridors.
  • Body:
    • Benefits of standardisation: scientific feasibility and pedestrian traffic surveys before construction reduce arbitrary placement and improve safety outcomes
    • Accountability: uniform repair timelines and central nodal oversight address the earlier problem of years-long delays caused by negligence of local bodies or contractors
    • Inclusion: mandatory ramps and lifts make FOBs usable for disabled and elderly persons, aligning with the rights-based approach to accessibility
    • Safer alternatives: prioritising underpasses with CCTV and drainage where stair climbing is difficult, and protecting crossings during highway widening
    • Challenges: coordination between NHAI and local bodies, maintenance funding, ensuring contractor compliance, and the cost of retrofitting over 3,000 existing FOBs
  • Conclusion: A uniform SOP is a necessary step, but its success will depend on inter-agency coordination, dedicated maintenance funding and periodic audits so that pedestrian safety is treated as a continuing obligation rather than a one-time design requirement.

Question 2(GS-2 | 150 words | 10 marks)

Pedestrian safety on Indian highways is a neglected dimension of road safety despite high fatality rates among walkers. Discuss the role of infrastructure such as foot overbridges and underpasses in building a safe, inclusive road system, and suggest measures beyond physical infrastructure to make these facilities effective.

Answer outline

  • Introduction: Open by linking the NHAI's new SOP to the broader need for pedestrian-centric road design, noting that the policy targets 1,500-2,000 new FOBs and overpasses to address population pressure and highway widening.
  • Body:
    • Role of FOBs and underpasses: separating pedestrians from fast-moving traffic on national highways
    • Inclusivity: ramps, lifts and accessible design for disabled and elderly users under the rights framework
    • Safety features: CCTV and drainage in underpasses to address security and waterlogging concerns
    • Beyond infrastructure: enforcement against jaywalking, awareness, footpath continuity and urban planning integration
  • Conclusion: Physical infrastructure must be backed by enforcement, public awareness and integrated planning so that the safe crossing built on paper is also the one pedestrians actually use.

Stuck? Get it in one tap

Practice questions

Pick an answer, then read the explanation.

  1. Q1Easy

    Which ministry is the nodal ministry for the National Highways Authority of India (NHAI)?

  2. Q2Hard

    Consider the following statements regarding NHAI's new SOP for foot overbridges (FOBs):

    • 1. Pedestrian traffic surveys are mandatory before an FOB on a national highway is constructed or demolished.
    • 2. Ramps and lifts are compulsory on FOBs for the convenience of disabled and elderly persons.
    • 3. The target is to build 3,000-4,000 new modern FOBs and overpasses in the coming years.

    Which of the statements given above is/are correct?

  3. Q3Medium

    How many new foot overbridges and overpasses does NHAI aim to build on national highways in the coming years?

  4. Q4Medium

    What is the primary objective of NHAI's new SOP for foot overbridges?

Frequently asked questions

1. What is NHAI's new SOP for foot overbridges?

NHAI has issued a new Standard Operating Procedure (SOP) that mandates pedestrian traffic surveys before FOB construction, sets repair timelines, and requires ramps and lifts for disabled and elderly persons.

2. How many new foot overbridges and overpasses does NHAI plan to build?

NHAI aims to build 1,500 to 2,000 new modern foot overbridges and overpasses on national highways in the coming years.

3. Who is responsible for national highways in India?

The National Highways Authority of India (NHAI), under the Ministry of Road Transport and Highways, is responsible for the development and maintenance of national highways.

All sources

Stories from the last 30 days on the same topic, state or exams

Science & TechUPSC: Important

EDR mandate for new vehicles from October 2029

  • Proposed device: Event Data Recorder (EDR), 'black box' for vehicles
  • Nodal Ministry: Ministry of Road Transport and Highways
Background GK: Event Data Recorder (EDR)Nodal: Ministry of Road Transport and HighwaysDon't make this mistake!
3 questions · 3 minHindustan