Super Current Affairs

Infrastructure

Rajasthan Plans 3,940 km Road Network; 394 km of Delhi-Mumbai Expressway Complete

15 November 20264 min1 source4 questionsStory 6 of 13

For Prelims: Greenfield project, Access-controlled road, Detailed Project Report

For Mains: Economy: Infrastructure and transport; Geography: Transport networks and regional development

Source:Dainik BhaskarDainik Bhaskar

The news

Rajasthan will develop a new high-level road network of about 3,940 km, combining nine state-proposed greenfield expressways and four central expressway and access-controlled corridor projects, according to state and central government plans reported on 15 November 2026. The state’s nine greenfield expressways will extend over 2,750 km at an estimated cost of ₹60,000 crore, while the four central projects covering 1,190 km involve an expenditure of ₹40,520 crore.

Of the 441 km Delhi-Vadodara-Mumbai Expressway section in Rajasthan, 394 km was complete by March 2026, officials said. The corridor, which will connect Alwar, Bharatpur, Dausa, Sawai Madhopur, Tonk, Bundi and Kota districts, has an outlay of ₹19,420 crore. The 637 km Amritsar-Jamnagar Economic Corridor section in the state, involving ₹14,900 crore, is nearly complete and links Hanumangarh, Sri Ganganagar, Bikaner, Jodhpur, Barmer and Jalore. The network is expected to improve connectivity for industrial areas, agricultural producing regions and tourism centres, and reduce freight travel time and logistics costs, though the benefits will depend on project completion and development of connecting roads.

The state’s proposed expressways include the Jaipur-Kishangarh-Ajmer-Jodhpur, Kotputli-Kishangarh, Jaipur-Bhilwara, Bikaner-Kotputli, Beawar-Bharatpur, Jalore-Jhalawar, Ajmer-Banswara, Jaipur-Phalodi and Sri Ganganagar-Kotputli corridors. The detailed project report for the 394 km Jaipur-Kishangarh-Ajmer-Jodhpur-Pachpadra high-speed corridor is under preparation. A separate 99 km Jaipur Northern Ring Road is also proposed, and its DPR is being prepared.

Rajasthan road network plans: why in the news?

The state and central governments have reported the status of Rajasthan’s planned 3,940 km high-level road network, with 394 km of the Delhi-Vadodara-Mumbai Expressway already complete and the Amritsar-Jamnagar corridor section nearly finished, making this a major infrastructure update for the state.

What is a greenfield expressway?

A greenfield expressway is built on a new alignment with no pre-existing road. The National Highways Authority of India was constituted under the NHAI Act, 1988.

What is the proposed network and who is building it?

The network comprises nine state greenfield expressways (2,750 km, ₹60,000 crore) and four central greenfield expressway and access-controlled corridor projects (1,190 km, ₹40,520 crore). The central projects are the Delhi-Vadodara-Mumbai Expressway and the Amritsar-Jamnagar Economic Corridor, along with two other unnamed projects. The state expressways are designed to connect eastern Rajasthan with Ajmer and western industrial areas, and to link the Delhi-Mumbai Expressway with the Amritsar-Jamnagar corridor.

What benefits are expected and what do they depend on?

Better connectivity is expected to reduce travel time, ease freight movement, boost industrial investment and trade, help farmers access mandis and other markets, and promote tourism-linked local business and employment. Western Rajasthan, in particular, may gain easier access to Delhi and Gujarat’s ports. Officials said these benefits will materialise only after the projects are completed and connecting roads are developed.

What is the next step for the pending projects?

The detailed project report for the 394 km Jaipur-Kishangarh-Ajmer-Jodhpur-Pachpadra high-speed corridor is under preparation, as is the DPR for the proposed 99 km Jaipur Northern Ring Road. Completing these planning processes and developing connecting roads will be necessary to translate the proposed connectivity into practical benefits.

Major central corridors in Rajasthan

CorridorRajasthan lengthStatus
Delhi-Vadodara-Mumbai441 km394 km complete by March 2026
Amritsar-Jamnagar637 kmNearly complete

Rajasthan connection

Matters for these Rajasthan exams:RPSC RASRSSB

Rajasthan road network plans: facts and terms for exams

Greenfield project:
A project developed on a new site rather than through expansion of an existing facility.
Access-controlled road:
A road on which entry and exit are restricted to designated points.
Detailed Project Report:
A planning document that sets out a project’s technical, financial and implementation details.

Rajasthan road network plans: why it matters for exams

Exams: RPSC RAS, RSSB

Syllabus: Economy: Infrastructure and transport; Geography: Transport networks and regional development

Common mistake: Examiners may swap the 394 km completed section of the Delhi-Vadodara-Mumbai Expressway with its 441 km total length in Rajasthan; the two figures describe different measures.

Mains question on Rajasthan road network plans

Examine the role of greenfield expressway and access-controlled corridor projects in improving regional connectivity and economic development in Rajasthan. What challenges may affect their timely completion?

Stuck? Get it in one tap

Practice questions

Pick an answer, then read the explanation.

  1. Q1Easy

    What does DPR stand for in the planning of Rajasthan’s proposed Jaipur Northern Ring Road?

  2. Q2Hard

    Consider the following statements about Rajasthan’s road projects in 2026:

    1. 1.Nine state greenfield expressways are proposed.
    2. 2.The proposed Jaipur Northern Ring Road is one of those nine expressways.
    3. 3.The Amritsar-Jamnagar Economic Corridor section in Rajasthan is nearly complete.

    Which of the statements given above are correct?

  3. Q3Medium

    How much of the Delhi-Vadodara-Mumbai Expressway section in Rajasthan had been completed by March 2026?

  4. Q4Medium

    What is the intended transport benefit of Rajasthan’s proposed Jaipur Northern Ring Road?

Frequently asked questions

1. How many state expressways are proposed in Rajasthan?

Nine greenfield expressways are proposed, covering over 2,750 km.

2. How much of the Delhi-Vadodara-Mumbai Expressway was complete in Rajasthan by March 2026?

A 394 km stretch was complete out of the 441 km section in Rajasthan.

3. How long is the proposed Jaipur Northern Ring Road?

The proposed road is 99 km long, and its detailed project report is under preparation.

4. What is the status of the Amritsar-Jamnagar corridor in Rajasthan?

The 637 km Rajasthan section is nearly complete.

All sources

Stories from the last 30 days on the same topic, state or exams

EconomyBiharBPSC: Important

Bihar: ₹2,292 crore Reliance complex proposed

  • Project company: Reliance Consumer Products Limited
  • State department: Department of Industries, Government of Bihar
Background GK: Greenfield projectNodal: Bihar Department of IndustriesDon't make this mistake!
4 questions · 3 minDainik Bhaskar
InfrastructureArunachal Pradesh

Siang project: NHPC dam proposed in Arunachal Pradesh

  • Project developer: National Hydroelectric Power Corporation (NHPC)
  • River: Siang, known as the Brahmaputra
Background GK: Multipurpose river projectNodal: NHPCDon't make this mistake!
4 questions · 3 minThe Hindu
InfrastructureUttar PradeshUPPSC: Important

Agra defence corridor: 1.25 km expressway link proposed

  • Full form of UPEIDA: Uttar Pradesh Expressways Industrial Development Authority
  • Proposed road width: 100 feet
Background GK: Industrial corridorNodal: UPEIDADon't make this mistake!
3 questions · 3 minHindustan
InfrastructureUttar PradeshMaharashtraKarnatakaRailway: Very important

Vande Bharat Sleeper: Varanasi-Delhi & Mumbai-Bengaluru routes launched

  • Routes launched: Varanasi-New Delhi and Mumbai-Bengaluru
  • Classes of travel: First AC, Second AC, Third AC
Background GK: Vande Bharat ExpressCancellation charges: 25%Nodal: Ministry of RailwaysDon't make this mistake!
4 questions · 2 minIndian Express