PM Surya Ghar: Muft Bijli Yojana is a rooftop solar scheme for households. It provides a subsidy for rooftop solar systems, helping households generate electricity and reduce their bills.PIB
The scheme aims to help households save on electricity bills and earn additional income by selling surplus power to DISCOMs.PIB
Uttar Pradesh has sent a proposal to the Union government for a large-scale rooftop project under this scheme, which uses a utility-based aggregation model. The state already leads the country in cumulative installations under the scheme.Hindustan
Pradhan Mantri Surya Ghar Muft Bijli Yojana (PM-Surya Ghar: Muft Bijli Yojana): quick facts
- Launch date
- Announced and launched by the Prime Minister on 13 February 2024
- Cabinet approval
- Union Cabinet approved on 29 February 2024 with an outlay of ₹75,021 crore for one crore households
- Ministry
- Ministry of New and Renewable Energy (MNRE)
Key facts
| Launch date | Announced and launched by the Prime Minister on 13 February 2024PIB |
|---|---|
| Cabinet approval | Union Cabinet approved on 29 February 2024 with an outlay of ₹75,021 crore for one crore householdsPIB |
| Ministry | Ministry of New and Renewable Energy (MNRE)PIB |
| Central subsidy (CFA) | ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more, at current benchmark prices; CFA capped at 3 kW.PIB |
| Target | One crore households by March 2027PIB |
| Loan terms | Collateral-free, low-interest loans at around 7% for residential rooftop systems up to 3 kWPIB |
| Portal | National portal pmsuryaghar.gov.inPIB |
Key features and how it works
- Central Financial Assistance is 60% of system cost for 2 kW systems and 40% of the additional cost for systems between 2 and 3 kW, capped at 3 kW.PIB
- Households apply through the National Portal and choose a vendor. The portal gives system size advice, a benefits calculator and vendor ratings.PIB
- Households can access collateral-free, low-interest loans at around 7% for residential rooftop solar systems up to 3 kW.PIB
- After installation, details are uploaded to the portal, which informs the DISCOM to inspect; the applicant can then redeem the subsidy on the portal. PIB states that subsidies are now processed within 15 days.PIB
- A Model Solar Village is developed in each district. ₹800 crore is set aside, with ₹1 crore given to each selected village.PIB
- The scheme also has a payment security component for RESCO-based models and a fund for innovative rooftop solar projects; Urban Local Bodies and Panchayati Raj Institutions get incentives for promoting installations.PIB
Eligibility and rules
- Households can apply for the subsidy through the National Portal.PIB
- Households that have already taken a solar subsidy from the government are not eligible for a fresh one.
- According to Wikipedia, applicants must be Indian citizens and own a legal house with sufficient rooftop space.
Static GK
- Ministry of New and Renewable Energy (MNRE): founded as the Ministry of Non-Conventional Energy Sources in 1992, headquarters Lodi Road, New Delhi, role: nodal ministry for renewable energy including rooftop solar.
- Solar Energy Corporation of India (SECI): a CPSU under MNRE, set up on 20 September 2011, the only CPSU dedicated to the solar sector, works on implementing solar missions.
- Indian Renewable Energy Development Agency (IREDA): a non-banking financial institution under MNRE that provides term loans for renewable energy and energy efficiency projects.
- State nodal agencies: MNRE establishes agencies in states and union territories to promote renewable energy.
Comparison
PM Surya Ghar vs PM-KUSUM
| Basis | PM Surya Ghar: Muft Bijli Yojana | PM-KUSUM |
|---|---|---|
| Target group | Residential households with rooftops | Farmers (agriculture pumps and farm land) |
| Central subsidy | 60% of cost for 2 kW, 40% of additional cost for 2 to 3 kW; ₹78,000 at 3 kW or more | 30% CFA (50% for North Eastern, hilly regions and islands) for standalone and grid-connected pumps |
| Launch year | 13 February 2024 (announced by PM) | March 2019 |
| Implementing body | National portal run by MNRE; DISCOMs and state agencies do inspection | MNRE with State Implementing Agencies |
Achievements
- By 4 December 2024, 6.3 lakh installations had been completed within nine months, an average of 70,000 per month, about ten times the average before the scheme.PIB
- Uttar Pradesh leads the country in cumulative rooftop installations under the scheme, with 962,866 systems installed so far.Hindustan
- The scheme has trained about 40,000 personnel and activated nearly 9,000 vendors by December 2024, building capacity for large-scale installation.PIB
Challenges
- Early implementation challenges were addressed through measures including DISCOM auto-load enhancements and waiving technical feasibility approvals for some systems.PIB
- Uneven progress across states means some regions may lag behind leaders, so reaching the national target depends on stronger support in weaker states.
- Households with a shaded or weak roof, or without an owned house, may find it hard to qualify, which can leave some groups outside the scheme's reach.
Way forward
- Provide handholding and awareness to households so that the application deadline is met and vendor choice is informed.
- Converge the central subsidy with state top-ups and DISCOM services, and use aggregation models so that large projects can be run in a coordinated way.
Timeline
31 March 2027
Last date to apply on the PM Surya Ghar portal, as stated in the Uttar Pradesh proposal news.Hindustan
17 November 2026
Uttar Pradesh has sent the Union government a proposal for rooftop solar at 500,000 homes under a utility-based aggregation model, with applications urged before 31 March 2027.
Read the story4 December 2024
PIB reported 6.3 lakh installations and a target of 10 lakh by March 2025.PIB
29 February 2024
Union Cabinet approved the scheme with an outlay of ₹75,021 crore.PIB
13 February 2024
Prime Minister announced and launched the scheme.PIB
Every new story on this subject is added here automatically.
Frequently asked questions
What is the central subsidy for a 3 kW rooftop solar system under PM Surya Ghar?
A 3 kW or larger system gets a central subsidy of ₹78,000 at benchmark prices, capped at 3 kW.PIB
When was PM Surya Ghar: Muft Bijli Yojana launched?
The Prime Minister launched it on 13 February 2024, and the Union Cabinet approved it on 29 February 2024.PIB
How many households is PM Surya Ghar targeting?
The target is one crore households by March 2027.PIB
GS paper mapping
- GS-3Energy: renewable energy sources, solar energy and rooftop solar
- GS-2Government policies and interventions for development in various sectors
- GS-3Employment generation and inclusive growth
Sources
Every fact on this page was checked against these pages.