Source:Dainik Bhaskar
Subject: Indian Polity and Governance; Federalism, Centre-State Relations, Infrastructure and Economic Development|Target exams: UKPSC, UKSSSC
Key points for Prelims: Externally Aided Projects (EAP), Special Assistance to States for Capital Investment (SASCI), Revamped Distribution Sector Scheme (RDSS), Regional Rapid Transit System (RRTS), Inland Waterways Authority of India
Mains syllabus mapping
- General Studies Paper 2: Federal structure, centre-state relations, fiscal federalism, functions of the Union and States
- General Studies Paper 3: Infrastructure: roads, railways, inland waterways, ropeways and energy sector; investment models and public finance
Key facts for one-day exams
- Kichha in Udham Singh Nagar was proposed for an All India Institute of Ayurveda.
- Uttarakhand sought approval for a Delhi-Haldwani expressway.
- The state cited ₹500 crore in assistance for Kumbh 2027.
- House of Himalayas has 22 registered trademarks.
- Uttarakhand ranked first among small states in the Export Preparedness Index.
Uttarakhand development proposals: why in the news?
The Chief Minister's meeting with the Prime Minister on November 20, 2026, in New Delhi, where he placed these specific development requests, makes Uttarakhand's pre-election infrastructure push the current news.
Uttarakhand Chief Minister Pushkar Singh Dhami presented an extensive development agenda to Prime Minister Narendra Modi in New Delhi on Friday, seeking central support for major connectivity, health and energy projects ahead of the state's 2027 assembly elections. The proposals include an expressway from Delhi to Haldwani, new rail lines, an All India Institute of Ayurveda at Kichha in Udham Singh Nagar district, and an exemption from the cap on externally aided projects (EAPs) to raise additional funds for development, officials said.
Among the connectivity proposals, Dhami requested approval for the Delhi-Haldwani expressway, a road-cum-rail tunnel for the Tanakpur-Bageshwar rail line, and a final location survey for an additional alignment. He also sought consideration for surveys on the Bageshwar-Karnaprayag rail line, doubling of the Haridwar-Dehradun railway line, and the Rishikesh-Uttarkashi rail line proposal. The state asked for a feasibility study from Meerut-Modipuram to Haridwar for extending the Regional Rapid Transit System (RRTS) towards Dehradun, and central assistance for a feasibility study for an inland waterway from Bajrang Setu to Bairagi Camp in Rishikesh, as well as for studies and forest clearance on the Dehradun-Mussoorie ropeway, according to the Chief Minister's office.
Dhami thanked the Prime Minister for ₹500 crore already approved for the Kumbh Mela 2027 and approximately ₹9,500 crore under the Special Assistance to States for Capital Investment (SASCI) scheme. The state also acknowledged ₹3,436.08 crore sanctioned under the Revamped Distribution Sector Scheme (RDSS) for smart metering and power-system strengthening, ₹199 crore for the Champawat bypass, and approval of the alignment for the Dehradun ring road project worth about ₹1,200 crore. The Chief Minister also sought financial and technical support to expand and modernise the Chinyalisaur airstrip for proposed civilian and military use.
Why did Uttarakhand seek exemption from the EAP cap?
Citing its mountainous terrain and limited financial resources, Uttarakhand has requested exemption from the cap on externally aided projects to gain greater access to development finance. Externally aided projects involve funding from external development partners; the exemption remains a state proposal and has not been granted.
How is the state promoting tourism and local products?
For tourism, the government is developing wedding destinations at Ramnagar, Dehradun, Rishikesh and Triyuginarayan, with new sites at Chopta-Duggalbitta, Patwadangar and the Sharda corridor. Three new spiritual tourism areas, Belkedar in Pauri, Anjanisaien and Tehri in Tehri, and Lohaghat and Shyamalatal in Champawat, have been identified. Winter tourism has started from the main Char Dham winter seats, with 50% discount at GMVN and KMVN guest houses. The House of Himalayas brand of local products has recorded a turnover of ₹6.9 crore and has 22 registered trademarks, with sales on Amazon, ONDC, Jio Mart, Big Basket and Blinkit. Under an agreement with the Indo-Tibetan Border Police, the state has supplied 218,000 kg of meat from 7,255 goats and 30 tonnes of fish. Uttarakhand ranked first among small states in the Export Preparedness Index, the Chief Minister said.
What are the key connectivity projects proposed?
The proposals include the Delhi-Haldwani expressway, a road-cum-rail tunnel for the Tanakpur-Bageshwar line with a final location survey for an additional alignment, surveys for the Bageshwar-Karnaprayag line, doubling the Haridwar-Dehradun line, and the Rishikesh-Uttarkashi line. The state also sought a feasibility study for extending RRTS from Meerut-Modipuram to Haridwar, assistance for an inland waterway feasibility study in Rishikesh, and central help with studies and forest clearance for the Dehradun-Mussoorie ropeway. The projects are at the request stage and require feasibility assessments, surveys and approvals before implementation.
Uttarakhand connection
Key terms
- Externally aided project:
- A development project supported by financing from external development partners.
- Feasibility study:
- An assessment of whether a proposed project is technically, financially and otherwise viable.
- Smart meter:
- An electricity meter that digitally measures consumption and can communicate usage data.
- Export Preparedness Index:
- An index assessing the export preparedness and performance of Indian states and union territories.
Uttarakhand development proposals: why it matters for exams
Exams: UKPSC, UKSSSC
Syllabus: Economy: Infrastructure and regional development; Geography: Uttarakhand: tourism and transport
Common mistake: Examiners may present the proposed Kichha Ayurveda institute as an approved All India Institute of Medical Sciences; the request concerns an All India Institute of Ayurveda and remains a proposal.
Mains practice questions
Question 1(GS-2 | 250 words | 15 marks)
The Centre's Special Assistance to States for Capital Investment and the cap on Externally Aided Projects both shape how Himalayan states finance their infrastructure. Critically examine the role of central assistance in balancing regional development and fiscal federalism in states like Uttarakhand.
Answer outline
- Introduction: Open by noting that Uttarakhand's pre-election requests to the Prime Minister, including SASCI funds and a demand for an EAP cap exemption, illustrate how states depend on central instruments for capital projects.
- Body:
- Explain SASCI as a conditional, incentive-linked tool that funds capital expenditure and encourages states to invest in productive assets, and its role in addressing revenue constraints.
- Discuss EAP borrowing from multilateral lenders and why a cap exists to protect the Centre's macroeconomic and fiscal control over external debt.
- Examine the tension between state demands for flexibility and the Centre's need for fiscal discipline, including concerns about uneven regional development.
- Highlight the benefit for hill states of central support for connectivity and disaster-prone terrain, where state revenues are limited.
- Suggest reforms such as transparent criteria for fund allocation, performance-based grants and strengthened state capacity for project execution.
- Conclusion: A balanced federal approach would combine fiscal discipline at the Centre with calibrated flexibility for states, so that capital assistance reduces regional disparities without weakening macroeconomic stability.
Question 2(GS-3 | 150 words | 10 marks)
Hill states face rising demand for connectivity, yet large projects such as expressways, rail tunnels and ropeways raise serious environmental and ecological concerns. Discuss the challenges in balancing infrastructure development with environmental sustainability in the Himalayan region.
Answer outline
- Introduction: Begin with the proposals for a Delhi-Haldwani expressway, tunnel-based rail links and a Dehradun-Mussoorie ropeway, which show how connectivity needs collide with fragile Himalayan ecology.
- Body:
- Note the economic case: improved access to tourism, trade and remote districts, and the need for reliable connectivity in regions like Bageshwar and Champawat.
- Identify ecological risks: deforestation, slope instability, and the need for forest clearance and location surveys before approval.
- Discuss the importance of environmental impact assessment, feasibility studies and sustainable engineering for tunnels and ropeways.
- Mention the role of local community consultation and the trade-off between short-term project gains and long-term resilience.
- Conclusion: Sustainable Himalayan infrastructure requires rigorous environmental appraisal, phased planning and community participation so that connectivity gains do not undermine the ecological base on which the region depends.
Stuck? Get it in one tap
Uttarakhand has requested central support for roads, railways, an Ayurveda institute and other projects. Externally aided projects are development projects supported by outside development partners; the state wants relief from the cap on them. These requests are proposals, not completed projects.
- Economy: Infrastructure and regional development
- Geography: Uttarakhand: tourism and transport
Related concepts: Externally aided project, Feasibility study, Smart meter, Export Preparedness Index
Practice questions
Pick an answer, then read the explanation.
- Q1Easy
Which ministry proposed the three All India Institutes of Ayurveda, one of which Uttarakhand sought for Kichha?
Explanation: The Ministry of Ayush proposed three All India Institutes of Ayurveda. Uttarakhand requested that one be established at Kichha, rather than proposing an institute under the other listed ministries.
- Q2Hard
Consider the following statements about Uttarakhand's development proposals:
- 1. The state sought approval for a Delhi-Haldwani expressway.
- 2. The state requested exemption from the cap on externally aided projects.
- 3. The Kichha institute requested by the state is an All India Institute of Medical Sciences.
Which of the statements given above is/are correct?
Explanation: Statements 1 and 2 are correct: the expressway and EAP cap exemption were requested. Statement 3 is incorrect because the requested Kichha institution is an All India Institute of Ayurveda.
- Q3Medium
How much was approved under RDSS for smart metering and electricity-system strengthening in Uttarakhand?
Explanation: The approved RDSS amount is ₹3,436.08 crore. The other figures do not match the approval.
- Q4Medium
Why did Uttarakhand seek an exemption from the cap on externally aided projects?
Explanation: The requested exemption aims to increase resources available through externally aided projects. The request is linked to the state's mountainous terrain and limited finances.
Frequently asked questions
1. Where has Uttarakhand proposed an All India Institute of Ayurveda?
Kichha in Udham Singh Nagar has been proposed as the location for one of three institutes proposed by the Ministry of Ayush.
2. Why did Uttarakhand seek exemption from the EAP cap?
The state sought greater access to development finance through externally aided projects, citing mountainous terrain and limited financial resources.
3. How much RDSS funding was approved for Uttarakhand?
₹3,436.08 crore was approved for smart metering and strengthening the electricity system.
4. What turnover did Uttarakhand's House of Himalayas brand reach?
The brand reached ₹6.9 crore in turnover and has 22 registered trademarks.
All sources
Original20 November 2026 · Read story


