Source:The Hindu
Subject: Indian Economy (Infrastructure: Energy) and India's Foreign Relations (Neighbourhood)
Key points for Prelims: Central Electricity Authority (CEA), Indian Energy Exchange (IEX), Run-of-the-river hydropower projects, Nepal Electricity Authority (NEA), Ministry of Power
Mains syllabus mapping
- General Studies Paper 2: India and its neighbourhood relations; bilateral and regional cooperation with Nepal
- General Studies Paper 3: Infrastructure: Energy; cross-border power transmission, hydropower and electricity markets
Key facts for one-day exams
- The Central Electricity Authority approved Nepal's import of up to 350 MW.
- The approval remains valid until 31 July 2027.
- The daily procurement limit is 17 hours.
- The New Nautanwa-Mainahiya line has an approved allocation of 50 MW.
- Flood-affected projects with 431 MW of installed capacity remained disconnected from Nepal's grid.
India-Nepal power trade: why in the news?
The Central Electricity Authority has approved Nepal's import of up to 350 MW of electricity from India for the winter season, valid from November 17, 2026, to July 31, 2027, to help the country manage a seasonal power deficit worsened by flood damage to hydropower projects.
India's Central Electricity Authority (CEA) has authorised Nepal to import up to 350 MW of electricity this winter to meet domestic demand, the Nepal Electricity Authority (NEA) said. The approval, valid from November 17, 2026, to July 31, 2027, allows the state-owned utility to procure power at competitive rates from the Indian Energy Exchange (IEX) for up to 17 hours a day, NEA Managing Director Dirghayu Kumar Shrestha said.
Of the approved capacity, 300 MW can be imported through the Kataiya-Kushaha, Ramnagar-Surajpura and Raxaul-Parwanipur transmission lines, while the remaining 50 MW can be sourced through the New Nautanwa-Mainahiya line. Nepal's run-of-the-river hydropower projects generate surplus electricity during summer months, which it exports mainly to India, but declining water levels in winter significantly reduce domestic production, forcing reliance on imports. The situation has been worsened by damage to several hydropower projects in central Nepal during the Rasuwa-Bhotekoshi floods in August, leaving projects with a combined installed capacity of 431 MW disconnected from the national grid. Officials said domestic generation is expected to improve from mid-April as river levels rise, potentially reducing import dependence and allowing exports to resume.
What is the background of CEA and IEX?
The Central Electricity Authority was established under the Electricity (Supply) Act, 1948. The Indian Energy Exchange was launched in 2008.
Why does Nepal need winter power imports?
Nepal depends heavily on run-of-the-river hydropower projects, whose electricity generation varies with river flow. Higher summer flows create a surplus that Nepal exports, mainly to India, while lower winter water levels reduce domestic generation, creating a seasonal mismatch between supply and demand. Cross-border electricity trade helps address this gap.
What has the flood damage meant for supply?
The Rasuwa-Bhotekoshi floods in August damaged several hydropower projects in central Nepal, leaving projects with a combined installed capacity of 431 MW disconnected from the national grid. This has further reduced domestic generation capacity during the winter months, increasing the need for imports.
When is domestic generation expected to recover?
Officials said domestic generation is expected to improve from mid-April as water levels in rivers gradually rise, reducing Nepal's dependence on imported electricity and potentially allowing it to resume exports. The approval extends through July 31, 2027, covering the full winter and early summer period.
Key terms
- Run-of-the-river hydropower:
- Hydropower generation that uses river flow, generally with limited water storage, making output dependent on available flow.
- Megawatt (MW):
- A unit of power equal to one million watts; it measures the rate of electricity generation or transmission.
- Electricity exchange:
- A trading platform on which electricity can be bought and sold through organised market mechanisms.
India-Nepal power trade: why it matters for exams
Syllabus: International Relations: India and its neighbourhood; Economy: Energy infrastructure and trade
Common mistake: Examiners may present 350 MW as electricity already imported or 431 MW as the import ceiling; 350 MW is the approved ceiling, while 431 MW is the disconnected installed capacity.
Mains practice questions
Question 1(GS-3 | 250 words | 15 marks)
Nepal's dependence on Indian electricity imports during winter reflects the seasonal nature of its hydropower sector. Critically examine the challenges faced by run-of-the-river hydropower projects and evaluate how cross-border power trade with India can strengthen energy security in the region.
Answer outline
- Introduction: Open by noting that the CEA's approval of up to 350 MW of imports for Nepal's winter deficit shows how seasonal water flows, not only installed capacity, shape a hydropower economy.
- Body:
- Explain the run-of-the-river model: high summer generation and surplus exports, sharp winter fall in river flows and output, forcing imports.
- Highlight physical vulnerability: August floods in central Nepal disconnected projects with 431 MW from the grid, showing the risk of disaster damage to hydropower assets.
- Discuss how cross-border transmission lines (Kataiya-Kushaha, Ramnagar-Surajpura, Raxaul-Parwanipur, New Nautanwa-Mainahiya) and IEX-based procurement at competitive rates help balance supply.
- Evaluate the benefits for energy security, reduced load shedding and two-way trade, along with concerns such as import dependence, price exposure and the need for storage or reservoir projects.
- Conclusion: Conclude that cross-border power trade is a practical bridge over seasonal gaps, but durable energy security for Nepal needs diversified generation, storage capacity and climate-resilient infrastructure alongside regional grid integration.
Question 2(GS-2 | 150 words | 10 marks)
Discuss how India's approval of electricity imports for Nepal under cross-border transmission arrangements contributes to regional cooperation in South Asia. What are the limits of such energy-based diplomacy?
Answer outline
- Introduction: Open by stating that the CEA's authorisation for Nepal to buy up to 350 MW through the Indian Energy Exchange is a concrete example of energy cooperation becoming a neighbourhood policy tool.
- Body:
- Benefits: supports Nepal's winter supply, strengthens people-centred ties and builds trust through reliable supply.
- Mechanism: use of multiple interconnection points and market-based procurement shows institutional rather than purely political engagement.
- Limits: asymmetry in bargaining power, dependence on monsoon-linked generation, vulnerability to disasters, and the risk that trade is viewed as leverage rather than partnership.
- Need for transparent pricing, joint planning and investment in shared infrastructure to build mutual confidence.
- Conclusion: Conclude that energy trade can deepen regional cooperation when it is predictable, mutually beneficial and backed by long-term joint infrastructure planning.
Stuck? Get it in one tap
Nepal generates much of its hydropower using river flows, which fall in winter. India has approved electricity purchases of up to 350 MW to help Nepal meet demand. The approved amount is a maximum, not a record of electricity already imported.
- International Relations: India and its neighbourhood
- Economy: Energy infrastructure and trade
Related concepts: Run-of-the-river hydropower, Megawatt (MW), Electricity exchange
Practice questions
Pick an answer, then read the explanation.
- Q1Easy
Which Indian body authorised Nepal Electricity Authority to procure electricity from the Indian Energy Exchange?
Explanation: The Central Electricity Authority issued the authorisation and functions under the Ministry of Power. Nepal Electricity Authority is the procuring utility, while the Indian Energy Exchange is the trading platform.
- Q2Hard
Consider the following statements about Nepal's approved electricity imports from India for 2026-27:
- 1.The approval permits imports of up to 350 MW.
- 2.The approval permits procurement for up to 17 hours per day.
- 3.The entire approved capacity is allocated to the New Nautanwa-Mainahiya line.
Which of the statements given above is/are correct?
Explanation: Statements 1 and 2 are correct: the ceiling is 350 MW and the daily procurement limit is 17 hours. Statement 3 is incorrect because New Nautanwa-Mainahiya accounts for 50 MW, while three other lines account for 300 MW.
- Q3Medium
What combined installed capacity of Nepal's hydropower projects remained disconnected after the Rasuwa-Bhotekoshi floods?
Explanation: Flood-affected projects with a combined installed capacity of 431 MW remained disconnected from Nepal's national grid. The 350 MW figure is the approved import ceiling, not the affected capacity.
- Q4Medium
Why is Nepal's approved electricity procurement from India significant during winter?
Explanation: Lower winter river flows reduce Nepal's hydropower output, making imports useful for meeting demand. Procurement uses cross-border lines and does not guarantee exports or alter the design of hydropower projects.
Frequently asked questions
1. How much electricity can Nepal import from India under the 2026 approval?
Nepal can import up to 350 MW of electricity under the approval.
2. How long is Nepal's electricity import approval valid?
The approval is valid from 17 November 2026 to 31 July 2027.
3. Why does Nepal need electricity imports during winter?
Lower river flows reduce hydropower generation in winter, while flood damage has also affected several projects.
4. Which exchange can Nepal use to procure electricity from India?
The Nepal Electricity Authority can procure electricity from the Indian Energy Exchange at competitive rates.
All sources
Original18 November 2026 · Read story