PM E-DRIVE is India's central scheme to promote electric mobility, with emphasis on commercial vehicles and public transport.pmedrive.heavyindustries.gov.in
Following FAME-II, PM E-DRIVE was introduced to sustain EV demand incentives. FAME-II had shifted policy focus toward public and shared transport.
In Delhi, the scheme is being used to fund public EV charging. Delhi Transco is the nodal agency for installing 540 public chargers at 180 sites, ahead of the Delhi EV Policy 2026's electric-only registration rules.Hindustan
PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme: quick facts
- Launch date
- Gazette notification S.O. 4259 (E) dated 29 September 2024; implemented from 1 October 2024
- Parent ministry
- Ministry of Heavy Industries, Government of India
- Outlay
- ₹11,900 crore, enhanced by ₹1,000 crore through Gazette notification S.O. 4424(E) dated 10 August 2026
Key facts
| Launch date | Gazette notification S.O. 4259 (E) dated 29 September 2024; implemented from 1 October 2024pmedrive.heavyindustries.gov.in |
|---|---|
| Parent ministry | Ministry of Heavy Industries, Government of Indiapmedrive.heavyindustries.gov.in |
| Outlay | ₹11,900 crore, enhanced by ₹1,000 crore through Gazette notification S.O. 4424(E) dated 10 August 2026pmedrive.heavyindustries.gov.in |
| Scheme period | Extended to 31 March 2028 for all segments except e-3W (L5), which closed on 26 December 2025pmedrive.heavyindustries.gov.in |
| Segments | e-2Ws, e-3Ws (including e-rickshaws, e-carts and L5), e-ambulances, e-trucks, e-buses, charging infrastructure, and upgradation of testing agenciespmedrive.heavyindustries.gov.in |
| Charging infrastructure allocation | ₹2,000 crore under EV PCSpmedrive.heavyindustries.gov.in |
| Predecessor scheme | FAME-II, followed by the scheme to sustain demand after it |
Key features and how it works
- Demand incentive for e-2Ws: the scheme supports up to 45,79,120 electric two-wheelers. Registered commercial, privately owned and corporately owned e-2Ws with advanced batteries qualify.pmedrive.heavyindustries.gov.in
- Demand incentive for e-3Ws: the scheme provides for up to 39,034 e-rickshaws and e-carts and 2,88,809 L5 vehicles. Eligible vehicles must be registered for commercial use and have advanced batteries. The L5 segment closed on 26 December 2025.pmedrive.heavyindustries.gov.in
- E-ambulance incentive is the lower of ₹30,000 multiplied by battery capacity in kWh, or 35% of the ex-factory price.pmedrive.heavyindustries.gov.in
- E-truck incentive is the lowest of ₹5,000 multiplied by battery capacity in kWh, 10% of the ex-factory price (up to ₹1.25 crore, excluding trailer), or the maximum based on GVW.pmedrive.heavyindustries.gov.in
- Customers receive an e-Voucher at purchase. The scheme portal generates an e-KYC Aadhaar FACE authenticated voucher, and the download link is sent to the registered mobile number.pmedrive.heavyindustries.gov.in
Eligibility and rules
- e-2W: only vehicles fitted with advanced batteries qualify. Commercial, private and corporate registered vehicles are eligible.pmedrive.heavyindustries.gov.in
- e-3W: registered e-rickshaws and e-carts with advanced batteries qualify for demand incentive if registered for commercial use. The L5 segment closed on 26 December 2025.pmedrive.heavyindustries.gov.in
- e-ambulance: vehicles in the categories under AIS 125 (Part 1) qualify, namely Patient Transport Vehicle (Type B), Basic Life Support ambulance (Type C) or Advanced Life Support ambulance (Type D).pmedrive.heavyindustries.gov.in
- e-truck: N2 (3.5 to 12 tonnes) and N3 (12 to 55 tonnes) categories as defined in CMVR qualify.pmedrive.heavyindustries.gov.in
Static GK
- Ministry of Heavy Industries: the parent ministry that runs PM E-DRIVE and has its own portal, including e-Truck and e-Bus portals.pmedrive.heavyindustries.gov.in
- Faster Adoption and Manufacturing of (Hybrid and) Electric Vehicles (FAME): launched in 2015 by the Department of Heavy Industry as India's flagship EV scheme.
- Delhi Transco Limited (DTL) is the State Transmission Utility for the National Capital Territory of Delhi. It was formed when the Delhi Vidyut Board was unbundled on 1 July 2002.
- IS 17017: the Bureau of Indian Standards standard covering EV charging equipment and safety norms.
- Electricity (Supply) Act, 1948: the parent law under which the Delhi Vidyut Board was constituted in 1997.
Achievements
- The scheme has a defined outlay of ₹11,900 crore, enlarged in 2026, which signals a long-term commitment to EV demand.pmedrive.heavyindustries.gov.in
- Delhi has begun appointing operators for 540 public chargers at 180 sites under the scheme, which shows the scheme is being used to build charging access in cities.Hindustan
- The e-Voucher system with Aadhaar-based authentication links each incentive to a verified buyer, which supports traceability of the subsidy.pmedrive.heavyindustries.gov.in
Challenges
- Public charging infrastructure remains thin, and the Wikipedia article on EVs in India lists a lack of charging infrastructure and high upfront cost as main barriers.
- Several segments have closed or changed dates, such as e-3W (L5) closing on 26 December 2025, which can make planning harder for buyers and operators.pmedrive.heavyindustries.gov.in
- Incentives apply only to vehicles with advanced batteries and to specific commercial categories, which can leave some buyers outside the scheme.
Way forward
- Outcome monitoring of charger installation and utilisation at each site, so that the 540-charger target produces real usage.Hindustan
- Convergence between the Ministry of Heavy Industries scheme and state agencies such as Delhi Transco, so that charging sites, grid capacity and registration rules move together.
- Handholding for operators and small fleet owners on e-Voucher and incentive claims, so that eligible buyers are not excluded by process.
Timeline
31 March 2028
The scheme period was extended to 31 March 2028 for all segments except e-3W (L5).pmedrive.heavyindustries.gov.in
25 November 2026
Delhi Transco has begun appointing operators for 540 public EV chargers at 180 sites under PM E-DRIVE, ahead of Delhi's electric-only registration rules from January 2027.
Read the story10 August 2026
The scheme outlay was raised by ₹1,000 crore to ₹11,900 crore through Gazette notification S.O. 4424(E).pmedrive.heavyindustries.gov.in
26 December 2025
The e-3W (L5) segment of PM E-DRIVE was closed.pmedrive.heavyindustries.gov.in
29 September 2024
PM E-DRIVE was launched through Gazette notification S.O. 4259 (E), to be implemented from 1 October 2024.pmedrive.heavyindustries.gov.in
2015
FAME was launched by the Department of Heavy Industry as India's flagship EV scheme, and it preceded PM E-DRIVE.
Every new story on this subject is added here automatically.
Frequently asked questions
When was PM E-DRIVE launched?
PM E-DRIVE was launched through Gazette notification S.O. 4259 (E) dated 29 September 2024, and it was implemented from 1 October 2024.pmedrive.heavyindustries.gov.in
Which ministry runs PM E-DRIVE?
The Ministry of Heavy Industries, Government of India, runs PM E-DRIVE.pmedrive.heavyindustries.gov.in
What is the outlay of PM E-DRIVE?
The outlay is ₹11,900 crore, after a ₹1,000 crore increase through Gazette notification S.O. 4424(E) dated 10 August 2026.pmedrive.heavyindustries.gov.in
Is the e-3W (L5) segment still open under PM E-DRIVE?
No, the e-3W (L5) segment was closed on 26 December 2025, while other segments run until 31 March 2028.pmedrive.heavyindustries.gov.in
GS paper mapping
- GS-3Infrastructure: energy, ports, roads, transport
- GS-3Environment: pollution control, climate change, clean energy
- GS-3Indian economy: industrial policy and manufacturing schemes
- GS-2Government policies and interventions for development