Construction and Infrastructure Equipment (CIE) includes machines such as hydraulic excavators, ship-to-shore cranes, tunnel boring machines and off-highway trucks. Growth in infrastructure and housing is driving the industry.pmindia.gov.in
The scheme aims to build indigenous capacity in advanced CIE, strengthen global competitiveness, and promote Atmanirbhar Bharat, supply chain security and employment.pmindia.gov.in
Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem: quick facts
- Approval and outlay
- Union Cabinet approved on 25 November 2026 with a financial outlay of ₹11,000 crore
- Duration
- Eight years from FY2026-27 to FY2033-34
- Components
- Sales-linked incentive and a grant for a CIE testing facility
Key facts
| Approval and outlay | Union Cabinet approved on 25 November 2026 with a financial outlay of ₹11,000 crorepmindia.gov.in |
|---|---|
| Duration | Eight years from FY2026-27 to FY2033-34pmindia.gov.in |
| Components | Sales-linked incentive and a grant for a CIE testing facilitypmindia.gov.in |
| Incentive rate | Graded 13% to 8% of incremental sales value over five yearspmindia.gov.in |
| Testing facility grant | Up to ₹375 crore, in the nature of Viability Gap Fundingpmindia.gov.in |
| Market size | About ₹97,500 crore in FY2024-25, projected to about ₹2,28,100 crore by FY2029-30pmindia.gov.in |
Key features and how it works
- Sales-linked incentive: paid on the incremental sales value of eligible CIE equipment and components sold by approved applicants, in two categories, eligible OEMs and Component Manufacturers.pmindia.gov.in
- Graded rates: 13% to 8% of incremental sales value over a five-year incentive disbursement period (FY2028-29 to FY2032-33).pmindia.gov.in
- Testing facility grant: up to ₹375 crore, in the nature of Viability Gap Funding, to set up a dedicated, state-of-the-art CIE testing facility in the country.pmindia.gov.in
- The scheme aims to incentivise manufacturing of advanced equipment including Ship-to-Shore Cranes, Tunnel Boring Machines, Hydraulic Excavators and Off-Highway Trucks.pmindia.gov.in
- Timeline structure: a two-year gestation period (FY2026-27 to FY2027-28) to set up facilities, then five years of incentive disbursement, then a final year to settle incentives on FY2032-33 incremental sales.pmindia.gov.in
Eligibility and rules
- Incentives go to approved applicants: eligible OEMs and Component Manufacturers, on incremental sales of eligible CIE equipment and components. Detailed approval criteria are not in the sources opened for this page.pmindia.gov.in
Static GK
- The Ministry of Heavy Industries promotes the engineering industry, including machine tools, heavy electricals, industrial machinery and the auto industry. It also administers 40 operating CPSEs and 4 autonomous bodies, and regulates the automotive sector, including earth-moving equipment.
- The Ministry of Heavy Industries' PLI scheme for the National Programme on Advanced Chemistry Cell (ACC) Battery Storage was approved by the Union Cabinet on 12 May 2021 with an outlay of ₹18,100 crore.heavyindustries.gov.in
- The scheme provides a grant of up to ₹375 crore, in the nature of Viability Gap Funding, for a dedicated CIE testing facility.pmindia.gov.in
Comparison
CIE scheme vs. PLI Auto and PLI ACC Battery Storage
| Basis | CIE Manufacturing Scheme | PLI Auto | PLI ACC Battery Storage |
|---|---|---|---|
| Outlay | ₹11,000 crore | Not stated in the pages opened for this page | ₹18,100 crore |
| Incentive form | Graded 13% to 8% of incremental sales value over five years | Incentive on incremental sales (base year FY2019-20) | Subsidy disbursed over 5 years after 2-year commissioning period |
| Implementing body | Ministry of Heavy Industries | Ministry of Heavy Industries | Ministry of Heavy Industries |
| Coverage | Seven categories of CIE equipment and components; testing facility grant up to ₹375 crore | Automobile and auto components | Giga-scale ACC manufacturing, target 50 GWh |
| Status (PIB, 9 Dec 2025) | Newly approved, 25 Nov 2026 | Cumulative investment ₹35,657 crore, incentive ₹1,350.83 crore (till 30.11.2025) | 40 GWh awarded to four firms, 1 GWh installed (till 31.10.2025) |
Achievements
- The Cabinet approved the scheme on 25 November 2026, giving it a fixed ₹11,000 crore outlay and an eight-year horizon.pmindia.gov.in
- The scheme is designed to create a domestic base for the CIE value chain, from equipment makers to component suppliers, which can reduce reliance on imports.
- A dedicated testing facility, supported by a grant, can give domestic manufacturers the testing infrastructure they need to compete in global markets.
Challenges
- The incentive is paid only on incremental sales, so firms must first build capacity and sell before receiving support, which can slow the response of small manufacturers.
- Imported equipment from established global makers may remain price-competitive, and a sales-linked incentive does not directly address cost gaps in component supply.
- China announced export controls on key machinery, including tunnel boring machines, which could adversely affect India's infrastructure development.The Hindu
Way forward
- Outcome monitoring of incremental sales, investment and local value addition against the scheme's targets, as done for similar Ministry of Heavy Industries schemes.
- Handholding for small component makers so they can qualify as approved applicants and reach the sales thresholds in the early years.
- Convergence with the testing facility and with other Ministry of Heavy Industries schemes so that component and OEM capacity grow together.
Timeline
25 November 2026
Cabinet approved the ₹11,000-crore CIE manufacturing scheme to build indigenous capacity in advanced construction equipment and cut import dependence, with incentives paid over FY2028-29 to FY2032-33.
Read the story
Every new story on this subject is added here automatically.
Frequently asked questions
When was the CIE Manufacturing Scheme approved and by whom?
The Union Cabinet approved the scheme on 25 November 2026 with an outlay of ₹11,000 crore.pmindia.gov.in
What incentive rate does the CIE scheme give?
The sales-linked incentive is graded from 13% to 8% of incremental sales value over a five-year period.pmindia.gov.in
How much grant does the scheme give for a testing facility?
The scheme gives a grant of up to ₹375 crore, in the nature of Viability Gap Funding, for a dedicated CIE testing facility.pmindia.gov.in
GS paper mapping
- GS-3Indian economy: industrial growth, Make in India and Atmanirbhar Bharat
- GS-3Infrastructure: roads, ports, housing and construction equipment
- GS-3Government schemes: incentive-based manufacturing schemes such as PLI
- GS-2Government policies and schemes implemented by the Union Ministries
Sources
Every fact on this page was checked against these pages.