Super Current Affairs

Scheme

Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem: complete guide

An ₹11,000-crore, eight-year scheme run by the Ministry of Heavy Industries that gives sales-linked incentives and a testing-facility grant to make construction and infrastructure equipment and components in India.

Updated: 25 November 20261 storyUPSCSSC

Construction and Infrastructure Equipment (CIE) includes machines such as hydraulic excavators, ship-to-shore cranes, tunnel boring machines and off-highway trucks. Growth in infrastructure and housing is driving the industry.pmindia.gov.in

The scheme aims to build indigenous capacity in advanced CIE, strengthen global competitiveness, and promote Atmanirbhar Bharat, supply chain security and employment.pmindia.gov.in

Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem: quick facts

Approval and outlay
Union Cabinet approved on 25 November 2026 with a financial outlay of ₹11,000 crore
Duration
Eight years from FY2026-27 to FY2033-34
Components
Sales-linked incentive and a grant for a CIE testing facility

Key facts

Approval and outlayUnion Cabinet approved on 25 November 2026 with a financial outlay of ₹11,000 crorepmindia.gov.in
DurationEight years from FY2026-27 to FY2033-34pmindia.gov.in
ComponentsSales-linked incentive and a grant for a CIE testing facilitypmindia.gov.in
Incentive rateGraded 13% to 8% of incremental sales value over five yearspmindia.gov.in
Testing facility grantUp to ₹375 crore, in the nature of Viability Gap Fundingpmindia.gov.in
Market sizeAbout ₹97,500 crore in FY2024-25, projected to about ₹2,28,100 crore by FY2029-30pmindia.gov.in

Key features and how it works

  • Sales-linked incentive: paid on the incremental sales value of eligible CIE equipment and components sold by approved applicants, in two categories, eligible OEMs and Component Manufacturers.pmindia.gov.in
  • Graded rates: 13% to 8% of incremental sales value over a five-year incentive disbursement period (FY2028-29 to FY2032-33).pmindia.gov.in
  • Testing facility grant: up to ₹375 crore, in the nature of Viability Gap Funding, to set up a dedicated, state-of-the-art CIE testing facility in the country.pmindia.gov.in
  • The scheme aims to incentivise manufacturing of advanced equipment including Ship-to-Shore Cranes, Tunnel Boring Machines, Hydraulic Excavators and Off-Highway Trucks.pmindia.gov.in
  • Timeline structure: a two-year gestation period (FY2026-27 to FY2027-28) to set up facilities, then five years of incentive disbursement, then a final year to settle incentives on FY2032-33 incremental sales.pmindia.gov.in

Eligibility and rules

  1. Incentives go to approved applicants: eligible OEMs and Component Manufacturers, on incremental sales of eligible CIE equipment and components. Detailed approval criteria are not in the sources opened for this page.pmindia.gov.in

Static GK

  • The Ministry of Heavy Industries promotes the engineering industry, including machine tools, heavy electricals, industrial machinery and the auto industry. It also administers 40 operating CPSEs and 4 autonomous bodies, and regulates the automotive sector, including earth-moving equipment.
  • The Ministry of Heavy Industries' PLI scheme for the National Programme on Advanced Chemistry Cell (ACC) Battery Storage was approved by the Union Cabinet on 12 May 2021 with an outlay of ₹18,100 crore.heavyindustries.gov.in
  • The scheme provides a grant of up to ₹375 crore, in the nature of Viability Gap Funding, for a dedicated CIE testing facility.pmindia.gov.in

Comparison

CIE scheme vs. PLI Auto and PLI ACC Battery Storage

BasisCIE Manufacturing SchemePLI AutoPLI ACC Battery Storage
Outlay₹11,000 croreNot stated in the pages opened for this page₹18,100 crore
Incentive formGraded 13% to 8% of incremental sales value over five yearsIncentive on incremental sales (base year FY2019-20)Subsidy disbursed over 5 years after 2-year commissioning period
Implementing bodyMinistry of Heavy IndustriesMinistry of Heavy IndustriesMinistry of Heavy Industries
CoverageSeven categories of CIE equipment and components; testing facility grant up to ₹375 croreAutomobile and auto componentsGiga-scale ACC manufacturing, target 50 GWh
Status (PIB, 9 Dec 2025)Newly approved, 25 Nov 2026Cumulative investment ₹35,657 crore, incentive ₹1,350.83 crore (till 30.11.2025)40 GWh awarded to four firms, 1 GWh installed (till 31.10.2025)

Achievements

  • The Cabinet approved the scheme on 25 November 2026, giving it a fixed ₹11,000 crore outlay and an eight-year horizon.pmindia.gov.in
  • The scheme is designed to create a domestic base for the CIE value chain, from equipment makers to component suppliers, which can reduce reliance on imports.
  • A dedicated testing facility, supported by a grant, can give domestic manufacturers the testing infrastructure they need to compete in global markets.

Challenges

  • The incentive is paid only on incremental sales, so firms must first build capacity and sell before receiving support, which can slow the response of small manufacturers.
  • Imported equipment from established global makers may remain price-competitive, and a sales-linked incentive does not directly address cost gaps in component supply.
  • China announced export controls on key machinery, including tunnel boring machines, which could adversely affect India's infrastructure development.The Hindu

Way forward

  • Outcome monitoring of incremental sales, investment and local value addition against the scheme's targets, as done for similar Ministry of Heavy Industries schemes.
  • Handholding for small component makers so they can qualify as approved applicants and reach the sales thresholds in the early years.
  • Convergence with the testing facility and with other Ministry of Heavy Industries schemes so that component and OEM capacity grow together.

Timeline

  1. 25 November 2026

    Cabinet approved the ₹11,000-crore CIE manufacturing scheme to build indigenous capacity in advanced construction equipment and cut import dependence, with incentives paid over FY2028-29 to FY2032-33.

    Read the story

Every new story on this subject is added here automatically.

Frequently asked questions

When was the CIE Manufacturing Scheme approved and by whom?

The Union Cabinet approved the scheme on 25 November 2026 with an outlay of ₹11,000 crore.pmindia.gov.in

What incentive rate does the CIE scheme give?

The sales-linked incentive is graded from 13% to 8% of incremental sales value over a five-year period.pmindia.gov.in

How much grant does the scheme give for a testing facility?

The scheme gives a grant of up to ₹375 crore, in the nature of Viability Gap Funding, for a dedicated CIE testing facility.pmindia.gov.in

GS paper mapping

  • GS-3Indian economy: industrial growth, Make in India and Atmanirbhar Bharat
  • GS-3Infrastructure: roads, ports, housing and construction equipment
  • GS-3Government schemes: incentive-based manufacturing schemes such as PLI
  • GS-2Government policies and schemes implemented by the Union Ministries

Sources

Every fact on this page was checked against these pages.

  1. pmindia.gov.in
  2. heavyindustries.gov.in
  3. The Hindu

Latest stories on this subject