Subject: Indian Economy (Infrastructure, Energy) and India's Foreign Relations with Neighbours

Key points for Prelims: Lower Arun hydropower project, SJVN Limited, Arun River, Run-of-river hydropower, Sankhuwasabha and Bhojpur districts

Mains syllabus mapping

  • General Studies Paper 2: India and its neighbourhood: bilateral relations with Nepal, cooperation agreements
  • General Studies Paper 3: Infrastructure: energy, hydropower; Investment models (overseas subsidiary of a PSU)

Key facts for one-day exams

  • Lower Arun's planned hydropower capacity is 669 MW.
  • The project is located on Nepal's Arun River.
  • Its estimated cost is ₹5,792 crore.
  • Its estimated tariff is ₹4.99 per unit.
  • SJVN's wholly owned subsidiary is developing the project.

Lower Arun hydropower project: why in the news?

The foundation stone of the 669 MW Lower Arun hydropower project was jointly laid by the prime ministers of India and Nepal through a virtual ceremony, marking a key step in bilateral energy cooperation.

India and Nepal’s prime ministers, Narendra Modi and Balendra Shah, jointly laid the foundation stone of the 669 MW Lower Arun hydropower project in a virtual ceremony held from New Delhi on November 23, 2026. The project, being developed on the Arun River in eastern Nepal, is expected to strengthen bilateral energy cooperation.

The project is being developed by SJVN Lower Arun Power Development Company Private Limited, a wholly owned subsidiary of SJVN Limited, in the Sankhuwasabha and Bhojpur districts. According to Bhupendra Gupta, Chairman and Managing Director of SJVN, the estimated cost of the project is ₹5,792 crore, with an estimated tariff of ₹4.99 per unit. The project is expected to generate approximately 2,901 million units of electricity annually.

Key features and how it works

  • The project is being built on the Arun River in eastern Nepal, in the Sankhuwasabha and Bhojpur districts.
  • It is being developed by SJVN Lower Arun Power Development Company Private Limited, a wholly owned subsidiary of SJVN Limited.
  • The estimated cost is ₹5,792 crore and the estimated tariff is ₹4.99 per unit.
  • It is expected to generate about 2,901 million units of electricity each year.

Related Static GK and comparison

  • SJVN Limited is a Navaratna public sector undertaking under the administrative control of the Ministry of Power.sjvn.nic.in
  • SJVN Arun-3 Power Development Company Pvt Ltd (SAPDC) is listed as an SJVN subsidiary.

Achievements

  • The 669 MW foundation stone was laid jointly by the prime ministers of India and Nepal, which is presented as a step in bilateral energy cooperation.
  • SJVN's top management has inspected the Arun-3 site and started major infrastructure work for the Lower Arun project.sjvn.nic.in

Challenges

  1. The company thanked the Indian and Nepali governments for their support in obtaining the necessary project approvals quickly.
  2. Large dams usually raise land acquisition, resettlement and environmental concerns, which can slow progress and add cost. Lower Arun's own impacts on people and land were not confirmed from an opened source, so this point is general.
  3. Cross-border power projects depend on steady cooperation between two governments and two power sectors, so a change in political priorities can affect timelines. This is a general risk for such projects.

Way forward

  • Timely grant of the remaining statutory approvals on both sides is needed to keep construction on schedule.
  • Transparent monitoring of cost, tariff and generation against the estimates given at foundation stage would help build trust between the two countries.
  • Coordination between the Ministry of Power and the Ministry of External Affairs, which the story names as institutions involved, can help keep the project on track.

Connected to this news

Lower Arun Hydroelectric Project

A 669 MW hydroelectric project on the Arun River in eastern Nepal, being developed by SJVN Limited through its wholly owned subsidiary SJVN Lower Arun Power Development Company Private Limited.

Timeline

  1. 23 November 2026This story

    Foundation stone of the 669 MW Lower Arun hydropower project was jointly laid by the prime ministers of India and Nepal in a virtual ceremony, marking a key step in bilateral energy cooperation.

Read the full background

Key terms

Hydropower:
Hydropower is electricity generated by converting the energy of flowing or falling water.
Megawatt:
A megawatt is a unit of power equal to one million watts; it measures the rate of energy generation.
Electricity unit:
One unit of electricity is one kilowatt-hour, a measure of electrical energy.

Lower Arun hydropower project: why it matters for exams

Syllabus: International Relations: India-Nepal relations; Geography: Energy resources and hydropower

Common mistake: Examiners may present the foundation-stone ceremony as project commissioning; Lower Arun's generation and tariff remain estimates.

Mains practice questions

Question 1(GS-2 | 250 words | 15 marks)

Critically examine how cross-border hydropower projects such as the 669 MW Lower Arun project in Nepal can serve as instruments of India's neighbourhood policy, and discuss the challenges they face.

Answer outline

  • Introduction: Open by noting that the foundation stone was jointly laid by the prime ministers of India and Nepal, showing energy as a flagship of bilateral ties.
  • Body:
    • Energy cooperation as a tool of neighbourhood-first policy: building mutual dependence and goodwill with Nepal
    • Economic gains for both sides: power export revenue for Nepal and secure supply and market access for India
    • Role of an Indian PSU's overseas subsidiary (SJVN Lower Arun Power Development Company) in executing the project
    • Challenges: environmental and displacement concerns in Sankhuwasabha and Bhojpur, project delays, tariff and power purchase issues, and perceptions of asymmetry
    • Need for transparent consultation, local benefit-sharing and institutional safeguards
  • Conclusion: Hydropower can deepen trust between India and Nepal if projects are built on equitable partnership, transparent governance and genuine local benefits.
Show model answer

Introduction: The joint laying of the foundation stone of the 669 MW Lower Arun project by the prime ministers of India and Nepal shows energy as a flagship of bilateral ties. Being built on the Arun River by an Indian public sector firm's subsidiary, it tests how far hydropower can advance neighbourhood policy.

Instrument of neighbourhood policy

  • Energy cooperation builds mutual dependence and goodwill, central to a neighbourhood-first approach.
  • Power export from Nepal can give it steady revenue and India secure supply and market access.
  • Project executed by SJVN Lower Arun Power Development Company, an overseas subsidiary of an Indian PSU, shows state-led partnership.

Challenges

  • Environmental and displacement concerns in Sankhuwasabha and Bhojpur districts need careful assessment.
  • Project delays, cost overruns and tariff or power purchase disputes can strain relations.
  • Perceptions of asymmetry, where benefits seem to flow mainly to India, can fuel nationalist criticism in Nepal.

Way forward

  • Transparent consultation with local communities and clear benefit-sharing arrangements.
  • Strong environmental safeguards and institutional mechanisms for dispute resolution.

Conclusion: Hydropower can deepen trust between India and Nepal if projects rest on equitable partnership, transparent governance and genuine local benefits. Otherwise, it risks becoming a source of friction rather than goodwill.

Question 2(GS-3 | 150 words | 10 marks)

Evaluate the significance of hydropower development for India's energy security and the role of public sector enterprises in financing and executing such overseas projects.

Answer outline

  • Introduction: Link the story to the estimated annual generation of about 2,901 million units and the ₹4.99 per unit tariff, which show the scale of the contribution.
  • Body:
    • Hydropower as clean, renewable baseload energy supporting energy security and climate goals
    • SJVN's role as a hydropower-focused CPSE and the use of a wholly owned subsidiary to implement the project
    • Financial aspects: estimated cost of ₹5,792 crore and the need for long-term tariff and risk assessment
    • Risks such as seasonal variation, sedimentation and geopolitical or regulatory uncertainty
  • Conclusion: Hydropower offers strategic value, and its success depends on sound financial planning, risk management and balanced regional cooperation.
Show model answer

Introduction: The Lower Arun project, expected to generate about 2,901 million units annually at an estimated tariff of ₹4.99 per unit, shows the scale of hydropower's contribution. Its execution by SJVN, a hydropower-focused public sector enterprise, highlights the role of PSUs in overseas energy projects.

Significance for energy security

  • Hydropower is clean, renewable and capable of steady baseload supply, supporting energy security and climate goals.
  • Cross-border projects can diversify supply sources and add to regional power trade.

Role of public sector enterprises

  • SJVN uses a wholly owned subsidiary to implement the project, separating risk and enabling focused execution.
  • Estimated cost of ₹5,792 crore needs long-term financing and careful tariff planning.

Risks

  • Seasonal variation in river flow can affect output.
  • Sedimentation and geopolitical or regulatory uncertainty can affect returns.

Conclusion: Hydropower offers strategic value for India's energy security, and its success depends on sound financial planning, risk management and balanced regional cooperation. PSUs can lead such projects if governance and commercial discipline keep pace with ambition.

Stuck? Get it in one tap

Practice questions

Pick an answer, then read the explanation.

  1. Q1Hard

    Consider the following statements about Nepal's Lower Arun hydropower project:

    • 1. The project is being developed on the Arun River.
    • 2. Its estimated tariff is ₹4.99 per unit.
    • 3. Its annual generation of 2,901 million units has already been achieved.

    Which of the statements given above are correct?

  2. Q2Medium

    What is the planned capacity of Nepal's Lower Arun hydropower project?

Frequently asked questions

1. Where is the Lower Arun hydropower project located?

The project is on the Arun River in Sankhuwasabha and Bhojpur districts of eastern Nepal.

2. Who is developing the Lower Arun hydropower project?

SJVN Lower Arun Power Development Company Private Limited, a wholly owned subsidiary of SJVN Limited, is developing the project.

3. What is the estimated cost and tariff of Lower Arun?

The estimated cost is ₹5,792 crore and the estimated tariff is ₹4.99 per unit.

4. How much electricity is Lower Arun expected to generate annually?

The project is expected to generate approximately 2,901 million units annually.

All sources

Stories from the last 30 days on the same topic, state or exams

InfrastructureUttar PradeshUPPSC: Very important

₹3,677 crore road projects for Jaunpur, UP

  • Number of Projects: 8 (3 to be inaugurated, 5 foundation stones to be laid)
  • Inauguration Cost: ₹3,210 crore
New updateBackground GK: National Highways Authority of India (NHAI)Nodal: Ministry of Road Transport and HighwaysDon't make this mistake!
4 questions · 2 minHindustan
InfrastructureBiharBPSC: Important

₹3,822.31 crore NH-139W project planned in Bihar

  • Foundation-stone venue: Jafar Patti Industrial Area, Rajapakar, Vaishali
  • Current context: Prime Minister Narendra Modi laid the project's foundation stone.
Background GK: Greenfield roadDon't make this mistake!
2 questions · 3 minHindustan
PolityMadhya PradeshMPPSC: Very important

MP: 50% subsidy for private industrial parks, new MSME-IDC formed

  • Subsidy for private industrial parks: 50% of development cost, max ₹50 lakh/hectare
  • New company for MSME: Madhya Pradesh MSME Industrial Development Company (MSME-IDC)
Background GK: MSME (Micro, Small and Medium Enterprises)Nodal: Government of Madhya PradeshDon't make this mistake!
4 questions · 3 minDainik Bhaskar
Science & TechUPSC: Very important

Solar capacity 6007% up: 2.8 GW to 171 GW, cost ₹2.15/unit

  • Solar power cost in 2014-15: ₹8/unit
  • 2030 non-fossil capacity target: 500 GW
New updateBackground GK: Non-fossil fuel capacityNodal: Ministry of New and Renewable EnergyDon't make this mistake!
4 questions · 2 minThe HinduPIB
EnvironmentBiharBPSC: Very important

Patna plans ₹514.59 crore waste-to-energy plant

  • Responsible urban body: Patna Municipal Corporation
  • Project site: Ramchak Bairia, Patna
Background GK: Waste-to-energyNodal: Patna Municipal CorporationDon't make this mistake!
4 questions · 4 minDainik Bhaskar