Super Current Affairs

Infrastructure

Amrit Bharat Station Scheme: 13 Delhi Stations Under Redevelopment, ₹2,711 Crore Railway Allocation

19 November 20263 min1 source3 questionsStory 13 of 28
Full backgroundEverything covered at a glance

Source:The HinduThe Hindu

Subject: Infrastructure and Urban Development; Transport Infrastructure (Railways)|Target exams: DSSSB, Railway

Key points for Prelims: Amrit Bharat Station Scheme, Vande Bharat Sleeper train, Kavach safety system, New Delhi Railway Station, Hazrat Nizamuddin Railway Station

Mains syllabus mapping

  • General Studies Paper 3: Infrastructure: railways, urban transport and connectivity; Indian Railways modernisation and passenger amenities
  • General Studies Paper 2: Governance: Centre-State coordination in urban infrastructure; accessibility for persons with disabilities

Amrit Bharat Station Scheme: quick facts

Launch date
Launched by PM Narendra Modi on 6 August 2023
Parent ministry
Ministry of Railways
Nature of scheme
Phased redevelopment with a long-term vision

Key facts for one-day exams

  • Thirteen Delhi stations are being redeveloped under the Amrit Bharat Station Scheme.
  • The Delhi railway development allocation is ₹2,711 crore.
  • The New Delhi station holding area on the Ajmeri Gate side is complete.
  • Hazrat Nizamuddin's second entry is being redeveloped on the Sarai Kale Khan side.
  • The New Delhi-Varanasi Vande Bharat Sleeper features Kavach.

Amrit Bharat Station Scheme Delhi: why in the news?

Chief Minister Rekha Gupta announced the redevelopment of 13 Delhi railway stations under the Amrit Bharat Station Scheme and a ₹2,711 crore railway allocation, highlighting ongoing and completed works at key stations.

Delhi Chief Minister Rekha Gupta on Wednesday said that 13 railway stations in the Capital are being redeveloped under the Amrit Bharat Station Scheme, part of a ₹2,711 crore allocation for railway development in Delhi. The stations include New Delhi, Old Delhi, Hazrat Nizamuddin, Anand Vihar Terminal, Delhi Cantt, Delhi Sarai Rohilla, Delhi Shahdara, Narela, Safdarjung, Bijwasan, Sabzi Mandi, Tilak Bridge and Adarsh Nagar Delhi.

The redevelopment covers improved entry and exit arrangements, modernised station buildings, waiting rooms, seating, toilets, drinking water facilities, platform shelters, foot overbridges, lifts and escalators, according to a statement from the Chief Minister’s Office. Parking facilities, accessibility for persons with disabilities, improved passenger information systems and better connectivity to both sides of the city are also included. Ms. Gupta said the construction of a holding area on the Ajmeri Gate side of New Delhi Railway Station had been completed, and foundation work for a double basement and an elevated road had begun. At Hazrat Nizamuddin, the second entry point on the Sarai Kale Khan side is being redeveloped, and at Delhi Cantt, a new station building, arrival and departure concourses, an elevated road and platform improvements are under way.

Ms. Gupta also noted the recent launch of the New Delhi-Varanasi Vande Bharat Sleeper train, which will reach New Delhi via Varanasi, Prayagraj, Kanpur, Aligarh and Ghaziabad. The train features automatic doors, the Kavach safety system and comfortable berths, and is expected to encourage tourism, business, religious travel and regional connectivity.

Key features and how it works

  • Master-plan based redevelopment: each station gets a master plan, implemented in phases to improve access, circulating areas, waiting halls, toilets, lifts and escalators, cleanliness, free Wi-Fi and landscaping.PIB
  • Multimodal integration and city connectivity: the station is integrated with both sides of the city, with multimodal links and city centres created at the station in the long term.PIB
  • Passenger amenities: kiosks for local products under One Station One Product, better passenger information systems, executive lounges, business meeting spaces, and amenities for Divyangjans.PIB
  • Sustainability and design: the scheme envisages environment-friendly solutions, ballastless tracks and roof plazas where needed. A modular sewage treatment plant is planned for a station cited in the evidence.PIB
  • The Ministry of Railways launched the scheme. Project management includes Gati Shakti Units, the Rail Land Development Authority and departmental construction units.

Eligibility and key provisions

  1. No individual application or eligibility criteria: the scheme benefits every rail passenger who uses a station selected and redeveloped under it; there is no application process for individuals.govtschemesregister.com
  2. Stations are selected by the Ministry of Railways, and the selection is based on passenger footfall, revenue and strategic importance.govtschemesregister.com
  3. Selection is announced in phases, so a station that is not yet selected may be taken up in a later round.govtschemesregister.com

Related Static GK and comparison

  • Pradhan Mantri Gati Shakti (National Master Plan for Multi-modal Connectivity): announced by PM on 15 August 2021, launched 13 October 2021, approved by the Cabinet Committee on Economic Affairs on 21 October 2021; a digital platform for integrated planning of ministries including Railways.
  • Indian Railways: a departmental undertaking of the Ministry of Railways, which operates India's national railway system; the first passenger train ran in 1853 between Bombay and Thane.
  • Ministry of Railways: parent ministry of the Amrit Bharat Station Scheme.

Amrit Bharat Station Scheme vs Adarsh Station Scheme

BasisAmrit Bharat Station SchemeAdarsh Station Scheme
Stations covered1309 (India.gov.in); 1275 in the Wikipedia lead1253 (Wikipedia)
FocusComprehensive, phased redevelopment on master plans, city integration, local architectureImproving passenger amenities and upgrading existing stations
Launch / introductionLaunched 6 August 2023 by PM (PIB)Introduced before ABSS (Wikipedia, no date given)
Implementing bodyMinistry of Railways, with Gati Shakti Units, RLDA and construction unitsNot stated in the sources opened

Achievements

  • On 22 May 2025, PM Narendra Modi inaugurated 103 redeveloped stations across 18 States and UTs.
  • On 18 July 2026, 75 more redeveloped stations across 20 States were inaugurated at a combined cost of ₹1,570 crore.
  • Kanpur Central Railway Station is being modernised under the scheme, with work progressing rapidly according to the Railway Minister.

Challenges

  1. Large, multi-phase projects spread across hundreds of stations need strong coordination between zones, divisions, Gati Shakti Units and construction units.
  2. Redevelopment must be balanced against day-to-day operations at busy stations, so work has to be phased carefully.
  3. Stations in smaller towns may get less attention than major hubs, which can widen regional differences in facilities.

Way forward

  • Monitor outcomes at each station against its master plan, so progress is measured on passenger experience and not only on completed works.
  • Link station redevelopment with local product sales and city planning, so stations act as city centres and not only as travel points.
  • Use convergence with other schemes such as Gati Shakti and One Station One Product to fund and plan the wider area around each station.

Connected to this news

Amrit Bharat Station Scheme

A Ministry of Railways mission to redevelop 1309 railway stations across India with modern passenger amenities and city integration, for railway passengers and city planners.

Timeline

  1. December 2026

    Ministry of Railways set December 2026 as the target to bring redeveloped stations to over 400 (planned milestone).

  2. 18 November 2026This story

    Delhi Chief Minister Rekha Gupta announced redevelopment of 13 Delhi stations under the scheme and a ₹2,711 crore railway allocation for Delhi.

  3. 16 November 2026

    Kanpur Central Station is being modernised under the scheme, and the DPR and approvals for a 16-km elevated corridor at Anwarganj-Mandhana are complete, with construction expected shortly.

    Read the story
  4. 18 July 2026

    75 additional redeveloped stations across 20 States inaugurated.

  5. 22 May 2025

    PM inaugurated 103 redeveloped stations across 18 States and UTs, first major phase of completed works.

  6. 24 September 2023

    Phase 1 of the scheme started.

See the full timeline (8 events)
Read the full background

Delhi connection

Delhi

Matters for these Delhi exams:DSSSB

Key terms

Station redevelopment:
The improvement or reconstruction of railway station infrastructure and passenger facilities.
Foot overbridge:
An elevated pedestrian bridge that allows passengers to cross railway tracks or move between platforms.
Accessibility:
The design of facilities and services so that persons with disabilities can use them.

Amrit Bharat Station Scheme Delhi: why it matters for exams

Exams: DSSSB, Railway

Syllabus: Economy: Railway and transport infrastructure; Governance: Public infrastructure and accessibility

Common mistake: Examiners may present ₹2,711 crore as the exclusive cost of the 13 stations; it is the allocation for railway development in Delhi.

Mains practice questions

Question 1(GS-3 | 250 words | 15 marks)

Critically examine how station redevelopment under the Amrit Bharat Station Scheme can improve urban mobility and passenger experience in a metropolis like Delhi, and what challenges may arise in execution.

Answer outline

  • Introduction: Open by noting that Delhi's 13 stations under redevelopment, with a ₹2,711 crore railway allocation, show how railway stations are being converted from transit points into integrated urban hubs.
  • Body:
    • Benefits: modernised station buildings, platform shelters, lifts, escalators and foot overbridges improve comfort and safety for commuters.
    • Urban integration: parking, elevated roads and better connectivity to both sides of the city reduce last-mile congestion.
    • Inclusiveness: accessibility features for persons with disabilities and improved passenger information systems advance equitable access.
    • Challenges: construction in dense, operational stations can disrupt services and traffic; coordination among Centre, State, Indian Railways and local bodies is complex.
    • Sustainability: ensuring adequate maintenance, funding and operational efficiency after completion determines long-term impact.
  • Conclusion: Station redevelopment can transform urban mobility if accompanied by coordinated planning, timely execution and sustained maintenance that keeps passenger amenities functional beyond the construction phase.

Question 2(GS-3 | 150 words | 10 marks)

Discuss the role of new-generation trains such as the Vande Bharat Sleeper, equipped with the Kavach safety system, in strengthening regional connectivity and safe railway travel in India.

Answer outline

  • Introduction: Link the launch of the New Delhi-Varanasi Vande Bharat Sleeper, with automatic doors and Kavach, to India's push for faster and safer long-distance rail travel.
  • Body:
    • Regional connectivity: the route through Varanasi, Prayagraj, Kanpur, Aligarh and Ghaziabad links the Capital with key northern cities and religious and tourism centres.
    • Economic impact: faster, comfortable travel supports business, tourism and labour mobility.
    • Safety: Kavach, an automatic train protection system, reduces the risk of collisions, and automatic doors improve passenger safety.
    • Comfort and modernity: sleeper berths extend the Vande Bharat experience to overnight travellers.
  • Conclusion: Such trains can deepen regional integration and safety, provided that network capacity, track upgrades and Kavach coverage expand together.

Stuck? Get it in one tap

Practice questions

Pick an answer, then read the explanation.

  1. Q1Hard

    Consider the following statements about Delhi railway station redevelopment:

    • 1. The Ajmeri Gate-side holding area at New Delhi Railway Station has been completed.
    • 2. The second entry at Hazrat Nizamuddin is on the Sarai Kale Khan side.
    • 3. The redevelopment excludes facilities for persons with disabilities.

    Which of the statements given above is/are correct?

  2. Q2Medium

    What amount has been allocated for railway development in Delhi?

  3. Q3Medium

    Which combination best reflects the objectives of the Delhi station redevelopment under the Amrit Bharat Station Scheme?

Frequently asked questions

1. How many Delhi stations are covered by the Amrit Bharat Station Scheme redevelopment?

Thirteen Delhi railway stations are being redeveloped under the scheme.

2. How much has been allocated for railway development in Delhi?

₹2,711 crore has been allocated for railway development in Delhi.

3. Where is the completed holding area at New Delhi Railway Station?

The completed holding area is on the Ajmeri Gate side.

4. Which safety system is installed on the New Delhi-Varanasi Vande Bharat Sleeper?

The train features the Kavach safety system.

All sources

Stories from the last 30 days on the same topic, state or exams

EnvironmentDelhiDSSSB: Very important

Delhi-NCR pollution: 40 extra train trips by NCRTC and DMRC

  • Full form of NCRTC: National Capital Region Transport Corporation
  • Full form of DMRC: Delhi Metro Rail Corporation
Background GK: Graded Response Action Plan (GRAP)GRAP Stage II restrictionsNodal: National Capital Region Transport Corporation (NCRTC)Don't make this mistake!
4 questions · 2 minHindustan
PolityDelhiDSSSB: Very important

Delhi transfers ₹141.88 crore for Diwali LPG assistance

  • Full form of DBT: Direct Benefit Transfer
  • Related scheme: Pradhan Mantri Ujjwala Yojana
Background GK: Direct Benefit TransferNodal: Government of DelhiDon't make this mistake!
4 questions · 3 minHindustan